My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC-2020-075-01
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC-2020-075-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:52:13 PM
Creation date
5/6/2020 4:04:46 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-075-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/1/2025
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pump Station/Wells/Lift Station/Facilities by Project Team <br />Project Name <br />Design <br />Complete <br />Pump Stations (over 27 in the last 15 <br />years) <br />Orange County Water District <br />Santiago Pump Station Modification 2019 <br />- 2020 <br />City of South Gate <br />Elizabeth Booster Pump Station <br />2016 <br />Orange County Water District <br />Burris Pump Station <br />2016 <br />Irvine Ranch Water District <br />Peters Canyon Channel Revise Pump <br />2016 <br />_ <br />Facilities <br />West Basin MWD _ _ <br />Dominguez BPS <br />20_11 <br />City of Orange <br />_ _ _ _ <br />New Santiago BPS <br />2010 <br />Irvine Ranch Water District <br />South County Zone 1-3 BPS <br />2008 <br />Water Wells (over 23 in the last 15 years) <br />City of Paramount <br />Well 16 <br />2019 <br />Orange County Water District <br />Mid Basin Injection Centennial Park <br />2017 <br />_City of South Gate <br />Well 29 <br />2016 <br />_City of Orange <br />_ _ _ <br />Well 27 - <br />2014 <br />Irvine Ranch Water District <br />Well 115 and 107 Replacement <br />2013 <br />Irvine Ranch Water District <br />Well 78 Replacement_ <br />2012 <br />City of Paramount <br />_ <br />Well 15 <br />2011 <br />Lift Stations (Bin the last 15 years) <br />City of Santa Ana <br />San Lorenzo Lift Station <br />2019 <br />_City of Santa Ana <br />Maxine Lift Station Bypass <br />2014 <br />South Coast WD <br />Sewer Lift Station Evaluation <br />2007 <br />Long Beach WD <br />5-25 Lift Station Modifications <br />2004 <br />Water Quality/Disinfection and Seismic Retrofits by Project Team <br />Water Quality/Disinfection <br />Moulton Niguel Water District <br />2018/19 Reservoir Management System <br />2019 - 2020 <br />City of Paramount _ <br />Well 16 Treatment Plant <br />2019 <br />City of Lakewood <br />Well 22 Treatment Facility <br />2015 <br />_ Irvine Ranch Water District <br />PDF Ammonia and Chlorine Mods_ <br />2013 <br />City of Paramount <br />_ <br />Chlorine Replacement at Wells 13 and 14 <br />2012 <br />City of Anaheim _ _ <br />Nohl TankDisinfection Modifications <br />2011 <br />Membrane Treatment <br />Irvine Ranch Water District <br />Well 21 and 22 Desalter <br />2015 <br />South Coast WD <br />Groundwater Recovery <br />2008 <br />Irvine Ranch Water District _ <br />_Desatination <br />Concentrate Treatment System <br />_ <br />2006 <br />Irvine Ranch Water District _ <br />Irvine Desalter Project <br />1 2005 <br />Seismic Retrofit/Rehabilitation <br />_ <br />_- <br />City of El Segundo <br />3.1 MG Seismic Strengthening <br />2010 <br />City of Pomona _ <br />Reservoir Safety and Seismic Upgrades <br />2009 <br />City of Ontario <br />Reservoir Seismic Evaluations_ <br />2008 <br />City of Santa Ana _ <br />_ <br />Elevated Tank Seismic Repair <br />_ <br />2008 <br />City of Riverside <br />Evans Reservoir Seismic Analysis <br />2006 <br />TETRA TECH <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.