Laserfiche WebLink
Staff Experience <br />MNWO On -Call <br />PM <br />QC <br />PE -- DE DE -- - <br />Carlsbad Conveyance Pipeline <br />QC <br />PM <br />PE DE -- DE - - <br />El Toro WD Recycled Water Expansion <br />PM <br />-- <br />PE - DE DE DE -- <br />IRWD Sand Canyon & IDP Conveyance Pipelines <br />PM <br />- <br />PE -- DE - DE PE <br />City of Santa Water Mains & SA FCF (5 projects) <br />QC <br />PM <br />PE - -- PE - -- <br />West Basin MWD On -Call Pipelines (4 projects) <br />QC <br />PM <br />PE DE DE DE DE - <br />City of Anaheim Transmission Mains (3 projects) <br />PM <br />QC <br />- -- DE DE DE PE <br />OCWD GWR, Barrier & Replacements (4 projects) <br />PM <br />PM <br />PE - - - DE PE <br />Vorba Linda Ohio & Oriente Replacement <br />QC <br />PM <br />PE -- DE DE - - <br />City of Santee Ana Sewers (2 projects) <br />QC <br />PM <br />- DE - DE DE - <br />OCSD SARI. Gisler & Warner (3 projects) <br />PM <br />PE <br />PE DE -- DE - -- <br />Long Beach WD Orange/151h /Broadway (4 projects) <br />PM <br />PM <br />- -- - DE DE PE <br />IRWD Wells(10 wells) <br />PM <br />- <br />PE - DE - DE PE <br />IRWD Pump Stations IS pump stations) <br />PM <br />PE <br />PE -- DE - DE PE <br />City of Orange Well 27 and BPS (2 BPS) <br />PM <br />PM <br />PE- - - - PE <br />City of Santa Ana Lift Stations (2 projects) <br />PM <br />PM <br />PE -- - DE - -- <br />IRWD PDF and OF Chlorine Mods (2 projects) <br />PM <br />- <br />- - -- -- - PE <br />City of Paramount Wells Disinfection (3 well sites) <br />PM <br />PE <br />-- - -- PE DE - <br />Anaheim Noll Tank Disinfection Modifications <br />PM <br />PE <br />- DE - - -- - <br />City of Lakewood Treatment Facilities (2 wells) <br />- <br />-- <br />- -- - - _ PE <br />IRWD Membrane Treatment Facilities (4 projects) <br />-- <br />-- <br />- DE - - -- -- <br />City of Ontario Reservoir Seismic Evaluations <br />- <br />- <br />-- - - -- - - <br />Pico Water District Master Plan and Studies <br />City of Torrance Model Update & Analyses <br />- <br />- <br />-- -- -- - - - <br />El Toro WD Customer Retrofits <br />PM <br />-- <br />- - DE DE -- -- <br />Upper District Customer Retrofits (2 projects) <br />PM <br />- <br />-- - DE - - - <br />PD: Pmject Director, PM: Pmject/fask Manager; PE PmjecPrask Engineer, DE: Design Engineer, QC: Quality Control <br />PE <br />PM <br />DE <br />- <br />-- <br />PNI <br />DE <br />PM <br />PE <br />_ <br />-- <br />- <br />PM <br />- <br />PM <br />DE <br />PM <br />DE <br />DE <br />PM <br />- <br />- <br />-- <br />- <br />-- <br />PM <br />DE <br />PM <br />PE <br />'" <br />- <br />-- <br />-- <br />- <br />PM <br />DE <br />PM <br />PE <br />DE <br />.. <br />_ <br />- <br />-- <br />PM <br />- <br />PM <br />- <br />DE <br />.. <br />_ <br />- <br />-- <br />PM <br />-- <br />PM <br />PE <br />- <br />QC <br />DE <br />-- <br />- <br />- <br />- <br />PM <br />- <br />-- <br />OC <br />DE <br />-- <br />- <br />PM <br />- <br />PM <br />- <br />- <br />QC <br />-- <br />PM <br />DE <br />- <br />- <br />PM <br />DE <br />PM <br />- <br />- <br />QC <br />DE <br />- <br />- <br />PM <br />DE <br />PM <br />PE <br />- <br />- <br />-- <br />- <br />PM <br />DE <br />- <br />- <br />PE <br />-- <br />.- <br />_ <br />PE <br />_ <br />_ <br />_ <br />- <br />_ <br />PE <br />PE <br />TETRA TECH Page 18 <br />