My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC-2020-075-01
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC-2020-075-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:52:13 PM
Creation date
5/6/2020 4:04:46 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-075-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
10/1/2025
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />ON -CALL <br />Water Resources Engineering <br />Well 27 Equipping Plan <br />Orange, California <br />Client Name: <br />City of Orange <br />Year Completed: <br />2016 <br />Reference: <br />City of Orange <br />189 S. Water Street <br />Orange, CA 92866 <br />Sonny Tran, PE <br />7141288-2475 <br />Tetra Tech provided engineering design services for the well drilling and well equipping of a potable <br />water well in the City of Orange. This project originally started in 2008 and due to funding shortage the <br />project was stopped in 2010. In 2012, the project resumed design. The project was broken up into <br />three stages: <br />Water Division Warehouse Partial Demolition Plan: The proposed well site is located within an <br />extension of the City of Orange Water Division warehouse. This portion of work included partial <br />demolition of the warehouse, grading and installation of 230 lineal feet of 24-inch storm drain pipeline <br />for the well waste line. <br />Well Drilling Plan: The well drilling plans were for drilling of a 20-inch portable water well to 950 feet <br />below ground surface with a maximum operational rate of 3,000 gallons per minute. The work <br />included destroying the existing Well 14. <br />Well Equipping Plan: The well equipping plans were for the equipping of a 3,000 gallons per minute <br />pump, electrical and chemical building for sodium hypochlorite treatment, emergency generator and <br />acoustical enclosure. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.