Laserfiche WebLink
Mark Bush, PE <br />QNQC <br />Mr. Bush has more than 24 years of professional experience in water, <br />wastewater and recycled water engineering. He has been responsible for <br />the completion of over 100 miles of potable water, recycled water and <br />sewer mains, 20 potable water and recycled water pump station and well <br />projects and 14 potable and recycled water reservoirs. Mr. Bush is an <br />integral part of the WaterNVastewater Department and brings leadership, <br />strong work ethic, technical knowledge and dedication to overall client <br />satisfaction on each and every project. <br />EXPERIENCE <br />Carlsbad Seawater Desalination Conveyance Pipeline, KSD Joint <br />Venture, Carlsbad, CA. Project Manager for 52,000 linear feet of <br />pipeline that serves the product water from the planned 50 mgd <br />desalination plant in the City of Carlsbad. Pipeline diameter is 54-inch <br />welded steel pipeline operating at a maximum pressure of 500 psi. One <br />flow control facility was completed. The pipeline is routed through the <br />cities of Carlsbad, San Marcos, and Vista. In addition, there are seven <br />tunnels located throughout the project. <br />Education: <br />B.S., Civil and Environmental <br />Engineering, University of <br />California, Irvine, 1997 <br />Registrations/Certifications: <br />Registered Civil Engineer, <br />California, No. 60477, 2000 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />American Water Works <br />Association <br />Orange County Water <br />Association <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />24 <br />Years with Tetra Tech: <br />24 <br />Carson Mall Lateral, Phase II, West Basin Municipal Water District, <br />Carson, CA. Project Manager for approximately 4,700 linear feet of 12- <br />inch PVC recycled water main within the City Carson. The project included the crossing of Los Angeles County <br />Flood Control Channel by bore and jack. <br />Mariposa El Segundo Recycled Water Lateral, West Basin Municipal Water District, El Segundo, CA. <br />Project Manager for approximately 1,600 linear feet of 6-inch PVC recycled water main to provide recycled <br />water to the Mattel Corporation in the City of El Segundo. <br />American Honda Filtration System, West Basin Municipal Water District, Torrance, CA. Project Engineer <br />for preparation of plans, specifications, and cost estimates to construct a recycled water filtration system for the <br />American Honda corporate facilities in the City of Torrance. The improvements included two automatic back <br />wash filters, pressure reducing valve, CMU retaining wall and yard piping. <br />Groundwater Replenishment System, Orange County Water District, Fountain Valley, CA. Project <br />Engineer for final design submittal for the Unit III pipeline as part of the Groundwater Replenishment Project. <br />This pipeline is approximately 23,000 linear feet of 66- and 60-inch pipeline. The project extends from Katella <br />Avenue along the Santa Ana River north to Carbon Canyon Diversion Channel then north to Kraemer Basin. <br />Barrier Pipelines, Orange County Water District, Fountain Valley, CA. Project Engineer for the design of <br />about 12,000 linear feet of 20- to 42-inch pipeline as part of the Groundwater Replenishment Project. Project <br />included the design of a drain line for the injection wells and coordination of permits from the City of Huntington <br />Beach, City of Fountain Valley, and SCE. <br />Firestone Boulevard Water Line Replacement, City of Downey, CA. Mr. Bush served as the Project <br />Manager for the Firestone Boulevard Water Line Replacement project. As part of the street resurfacing the City <br />proposed to remove and replace the existing water service lines/meter, install new fire hydrants, retrofit and <br />replace existing fire hydrants where possible, reconnect existing fire services, and perform various <br />abandonments. Additionally the City proposed to replace the undersized 4-, 6-, and 8-inch water mains along <br />Firestone Boulevard with one new 12-inch ductile iron main which will be connected in the new water service <br />line and fire hydrants and reconnected to the existing fire hydrants, fire services, and existing streetlalley main. <br />Work also included the extension of approximately 650 linear feet of 8-inch recycled water main. Tetra Tech <br />prepared the Plans, Specifications, and Cost Estimates in two separate plans to allow for flexibility for bidding. <br />TETRA TECH <br />