Mark Bush, PE
<br />QNQC
<br />Mr. Bush has more than 24 years of professional experience in water,
<br />wastewater and recycled water engineering. He has been responsible for
<br />the completion of over 100 miles of potable water, recycled water and
<br />sewer mains, 20 potable water and recycled water pump station and well
<br />projects and 14 potable and recycled water reservoirs. Mr. Bush is an
<br />integral part of the WaterNVastewater Department and brings leadership,
<br />strong work ethic, technical knowledge and dedication to overall client
<br />satisfaction on each and every project.
<br />EXPERIENCE
<br />Carlsbad Seawater Desalination Conveyance Pipeline, KSD Joint
<br />Venture, Carlsbad, CA. Project Manager for 52,000 linear feet of
<br />pipeline that serves the product water from the planned 50 mgd
<br />desalination plant in the City of Carlsbad. Pipeline diameter is 54-inch
<br />welded steel pipeline operating at a maximum pressure of 500 psi. One
<br />flow control facility was completed. The pipeline is routed through the
<br />cities of Carlsbad, San Marcos, and Vista. In addition, there are seven
<br />tunnels located throughout the project.
<br />Education:
<br />B.S., Civil and Environmental
<br />Engineering, University of
<br />California, Irvine, 1997
<br />Registrations/Certifications:
<br />Registered Civil Engineer,
<br />California, No. 60477, 2000
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />American Water Works
<br />Association
<br />Orange County Water
<br />Association
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />24
<br />Years with Tetra Tech:
<br />24
<br />Carson Mall Lateral, Phase II, West Basin Municipal Water District,
<br />Carson, CA. Project Manager for approximately 4,700 linear feet of 12-
<br />inch PVC recycled water main within the City Carson. The project included the crossing of Los Angeles County
<br />Flood Control Channel by bore and jack.
<br />Mariposa El Segundo Recycled Water Lateral, West Basin Municipal Water District, El Segundo, CA.
<br />Project Manager for approximately 1,600 linear feet of 6-inch PVC recycled water main to provide recycled
<br />water to the Mattel Corporation in the City of El Segundo.
<br />American Honda Filtration System, West Basin Municipal Water District, Torrance, CA. Project Engineer
<br />for preparation of plans, specifications, and cost estimates to construct a recycled water filtration system for the
<br />American Honda corporate facilities in the City of Torrance. The improvements included two automatic back
<br />wash filters, pressure reducing valve, CMU retaining wall and yard piping.
<br />Groundwater Replenishment System, Orange County Water District, Fountain Valley, CA. Project
<br />Engineer for final design submittal for the Unit III pipeline as part of the Groundwater Replenishment Project.
<br />This pipeline is approximately 23,000 linear feet of 66- and 60-inch pipeline. The project extends from Katella
<br />Avenue along the Santa Ana River north to Carbon Canyon Diversion Channel then north to Kraemer Basin.
<br />Barrier Pipelines, Orange County Water District, Fountain Valley, CA. Project Engineer for the design of
<br />about 12,000 linear feet of 20- to 42-inch pipeline as part of the Groundwater Replenishment Project. Project
<br />included the design of a drain line for the injection wells and coordination of permits from the City of Huntington
<br />Beach, City of Fountain Valley, and SCE.
<br />Firestone Boulevard Water Line Replacement, City of Downey, CA. Mr. Bush served as the Project
<br />Manager for the Firestone Boulevard Water Line Replacement project. As part of the street resurfacing the City
<br />proposed to remove and replace the existing water service lines/meter, install new fire hydrants, retrofit and
<br />replace existing fire hydrants where possible, reconnect existing fire services, and perform various
<br />abandonments. Additionally the City proposed to replace the undersized 4-, 6-, and 8-inch water mains along
<br />Firestone Boulevard with one new 12-inch ductile iron main which will be connected in the new water service
<br />line and fire hydrants and reconnected to the existing fire hydrants, fire services, and existing streetlalley main.
<br />Work also included the extension of approximately 650 linear feet of 8-inch recycled water main. Tetra Tech
<br />prepared the Plans, Specifications, and Cost Estimates in two separate plans to allow for flexibility for bidding.
<br />TETRA TECH
<br />
|