Laserfiche WebLink
Kyle Bohn, PE <br />Design Engineer —PW and RW Pipeline <br />Replacement/Extension <br />Mr. Bohn has provided design engineering in various water and <br />wastewater projects including domestic and reclaimed water pipelines, <br />water main replacements, gravity sewer mains, CIPP sewer lining, pump <br />stations, lift stations, reinforced concrete reservoirs, flow control facilities, <br />and pressure reducing valve vaults. Responsibilities have included <br />preparation of construction plans, specifications, and design calculations; <br />assisted supervisors in preparing project memorandums; organized office <br />technical library. <br />EXPERIENCE <br />Education: <br />B.S., Civil Engineering, <br />University of California, Irvine, <br />2006 <br />Registrations/Certifications: <br />Registered Civil Engineer, <br />California No. 77984, 2011 <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />13 <br />Years with Tetra Tech: <br />13 <br />Newport Boulevard Water Main Rehabilitation, City of Newport Beach, 1 1 <br />CA. Provided engineering support for the replacement/rehabilitation of the existing 20/16-inch cast iron pipeline <br />constructed in the mid-1920s within Newport/Balboa Boulevard from the intersection of Via Oporto and Central <br />Avenue to the intersection of Balboa Boulevard and 19th Street. This pipeline is vital as it provides water and fire <br />flow protection to the businesses and residents in the Newport Bay and Peninsula area. <br />GSWC Waterline Replacement Projects 2010, Golden State Water Company, City of Hawthorne and <br />County of Los Angeles, CA. As Design Engineer, assisted with completing design plans for several water <br />main replacement projects throughout the GSWC service areas primarily the Southwest District. The work was <br />completed as part of a design -build contract teamed with Precision Pipeline. Work included: existing utility <br />research and base map preparation, determining abandonment required, alignment selection and field check <br />surveys, interaction with GSWC project manager with plan check comments, and obtained permit conditions for <br />construction for various affected cities. Project locations included City of Hawthorne and County of Los Angeles. <br />Streets included: Budlong Avenue, Kornblum Avenue, 132nd Street, and Doty Avenue. Total water main footage <br />was approximately 6,000 feet of 12- through 16-inch pipe. <br />Water Line Replacement Projects, City of Lakewood, Lakewood, CA. Design Engineer for the preparation of <br />plans and specifications of multiple water line replacement projects for the City of Lakewood. Projects included <br />preparation of plans, specifications, and cost estimates for over 50,000 linear feet of 6- to 12-inch pipeline. <br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, Santa Ana, CA. Design <br />Engineer for approximately 20,000 linear feet of 8-inch PVC water main to replace existing water mains. <br />Central City Water Main Improvements, City of Santa Ana, Santa Ana, CA. Design Engineer for <br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water mains. <br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Design <br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's - Recycled <br />Water Distribution System Expansion Project. The pipelines ranged in size from 4-inch to 20-inch in diameter, <br />and convey up to 775 acre-feet of tertiary treated recycled water per year. The major customer being served <br />recycled water is the Laguna Woods Village Home Owners Association (formerly Leisure World). <br />Well No. 27, City of Orange, Orange, CA. Design Engineer for the drilling and equipping of Well No. 27, a new <br />potable water well (930 feet deep). The project involved the partial demolition of an existing warehouse to <br />accommodate the footprint of the new well, installation of a CMU block control building and sodium hypochlorite <br />building, 12.5% sodium hypochlorite disinfection facility, sound enclosure around the well head as well as site <br />and landscaping improvements. <br />SA-4 and SA-5 Vault Relocations, City of Santa Ana, Santa Ana, CA. Design Engineer for the design and <br />construction phases of two pressure reducing valve vaults. The project included the design of steel and ductile <br />iron yard piping and connections to the existing City system, pressure reducing valves, and concrete vaults. <br />TETRA TECH <br />