Kyle Bohn, PE
<br />Design Engineer —PW and RW Pipeline
<br />Replacement/Extension
<br />Mr. Bohn has provided design engineering in various water and
<br />wastewater projects including domestic and reclaimed water pipelines,
<br />water main replacements, gravity sewer mains, CIPP sewer lining, pump
<br />stations, lift stations, reinforced concrete reservoirs, flow control facilities,
<br />and pressure reducing valve vaults. Responsibilities have included
<br />preparation of construction plans, specifications, and design calculations;
<br />assisted supervisors in preparing project memorandums; organized office
<br />technical library.
<br />EXPERIENCE
<br />Education:
<br />B.S., Civil Engineering,
<br />University of California, Irvine,
<br />2006
<br />Registrations/Certifications:
<br />Registered Civil Engineer,
<br />California No. 77984, 2011
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />13
<br />Years with Tetra Tech:
<br />13
<br />Newport Boulevard Water Main Rehabilitation, City of Newport Beach, 1 1
<br />CA. Provided engineering support for the replacement/rehabilitation of the existing 20/16-inch cast iron pipeline
<br />constructed in the mid-1920s within Newport/Balboa Boulevard from the intersection of Via Oporto and Central
<br />Avenue to the intersection of Balboa Boulevard and 19th Street. This pipeline is vital as it provides water and fire
<br />flow protection to the businesses and residents in the Newport Bay and Peninsula area.
<br />GSWC Waterline Replacement Projects 2010, Golden State Water Company, City of Hawthorne and
<br />County of Los Angeles, CA. As Design Engineer, assisted with completing design plans for several water
<br />main replacement projects throughout the GSWC service areas primarily the Southwest District. The work was
<br />completed as part of a design -build contract teamed with Precision Pipeline. Work included: existing utility
<br />research and base map preparation, determining abandonment required, alignment selection and field check
<br />surveys, interaction with GSWC project manager with plan check comments, and obtained permit conditions for
<br />construction for various affected cities. Project locations included City of Hawthorne and County of Los Angeles.
<br />Streets included: Budlong Avenue, Kornblum Avenue, 132nd Street, and Doty Avenue. Total water main footage
<br />was approximately 6,000 feet of 12- through 16-inch pipe.
<br />Water Line Replacement Projects, City of Lakewood, Lakewood, CA. Design Engineer for the preparation of
<br />plans and specifications of multiple water line replacement projects for the City of Lakewood. Projects included
<br />preparation of plans, specifications, and cost estimates for over 50,000 linear feet of 6- to 12-inch pipeline.
<br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, Santa Ana, CA. Design
<br />Engineer for approximately 20,000 linear feet of 8-inch PVC water main to replace existing water mains.
<br />Central City Water Main Improvements, City of Santa Ana, Santa Ana, CA. Design Engineer for
<br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water mains.
<br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Design
<br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's - Recycled
<br />Water Distribution System Expansion Project. The pipelines ranged in size from 4-inch to 20-inch in diameter,
<br />and convey up to 775 acre-feet of tertiary treated recycled water per year. The major customer being served
<br />recycled water is the Laguna Woods Village Home Owners Association (formerly Leisure World).
<br />Well No. 27, City of Orange, Orange, CA. Design Engineer for the drilling and equipping of Well No. 27, a new
<br />potable water well (930 feet deep). The project involved the partial demolition of an existing warehouse to
<br />accommodate the footprint of the new well, installation of a CMU block control building and sodium hypochlorite
<br />building, 12.5% sodium hypochlorite disinfection facility, sound enclosure around the well head as well as site
<br />and landscaping improvements.
<br />SA-4 and SA-5 Vault Relocations, City of Santa Ana, Santa Ana, CA. Design Engineer for the design and
<br />construction phases of two pressure reducing valve vaults. The project included the design of steel and ductile
<br />iron yard piping and connections to the existing City system, pressure reducing valves, and concrete vaults.