My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC (2)-2020-065
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC (2)-2020-065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 12:25:38 PM
Creation date
5/6/2020 4:06:35 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-065
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Insurance Exp Date
10/1/2025
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
repairs or retrofits shall require methods of rehabilitation, design criteria and baseline structural <br />criteria. <br />In the event that the Consultant finds that the reservoirs do not meet current structural and <br />seismic codes, the following recommendations, at a minimum, shall be provided: <br />Appropriate upgrades to bring the reservoirs Into compliance, and <br />Appropriate safe water levels and roof loads in current condition before repairs can be <br />accomplished. <br />The Consultant shall provide preliminary estimates for all recommended repair work with a <br />schedule/timeline for when the repairs should occur and in the order in which they should occur. <br />In those instances where It is not economically practical to upgrade a reservoir to meet the <br />previously referenced codes and standards, the Consultant shall prepare: <br />1. A preliminary level cost opinion for replacing the storage facility. <br />2. A narrative on the constructability issues associated with any newly proposed storage <br />facilities. <br />3. A preliminary estimated time of construction for each newly proposed storage facility. <br />Design Element: <br />If requested by the City, the Consultant shall provide final engineering design services for the <br />appropriate recommended repair work from the reservoir assessments. The Consultant shall <br />consider this element as part of the cost proposal and have the ability to provide these services. <br />The Consultant shall provide any necessary site work, foundation design or repair elements, <br />structural support, coatings, related mechanical or electrical work to provide a complete repair <br />design. <br />The Consultant's scope for this piece will generally include the following: <br />1, The Consultant will provide a geotechnical report of the site where required by a licensed <br />geotechnical engineer. <br />2, The Consultant shall prepare all necessary bid documents including all civil, structural, <br />mechanical or electrical work as required to provide a complete project. The City shall <br />provide the boilerplate specification to the Consultant. <br />3. The Consultant shall manage a pre bid meeting when requested. <br />City of Santa Ana - RFP 19-107 <br />ENGINEERING SERVICES FOR SEISMIC AND STRUCTURAL ASSESSMENT OF THE CITY'S POTABLE WATER <br />STORAGE RESERVOIRS <br />
The URL can be used to link to this page
Your browser does not support the video tag.