My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC (2)-2020-065
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC (2)-2020-065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 12:25:38 PM
Creation date
5/6/2020 4:06:35 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC
Contract #
A-2020-065
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Insurance Exp Date
10/1/2025
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® TETRATECH Man Hong (Eric) Yuen, P.E., S.E. <br />Structural Project Manager <br />Mr. Yuen has over 12 years of experience in the design, analysis and detailing in <br />structural engineering. He is knowledgeable in reinforced concrete, masonry, <br />structural steel and wood frame design, and construction for a variety of building <br />and infrastructure projects including reservoirs, water/wastewater treatment <br />facilities, as well as seismic retrofit of existing structures. <br />EXPERIENCE <br />Hunting Horn Reservoir Structural/Seismic Evaluation, City of North <br />Tustin, CA, Golden State Water Company, 2019 As Project Manager, Mr. <br />Yuen is responsible for the overall project to provide professional <br />engineeringitechnical services including onsite reconnaissance inside the <br />reservoir to prepare a structural and seismic study and evaluation. The Hunting <br />Horn Reservoir is a semi -buried reinforced concrete cylindrical water tank that <br />was first constructed in 1900, converted to concrete in 1918, and gunite-lined in <br />1950. The reservoir has a capacity of 0.44 MG, measures approximately 72 feet <br />in diameter and 16 feet high and has a wood frame roof. Over the years it has <br />developed cracks in the interior shell that have been patched and has a slow leak <br />that is visible from the exterior and requires assessment and repair. Tetra Tech <br />prepared a comprehensive engineering study and seismic evaluation of the tank <br />to examine the alternatives available to GSWC for either repair or replacement. <br />Lower Acacia Reservoir (1-D) Structural Rehabilitation, Design Phase <br />Services and Construction Management, City of Fullerton, CA 2017-2019 — <br />Project Manager responsible for the inspection and engineering services, <br />structural rehabilitation Design Phase, Bid Phase and Construction Support <br />Services for the improvements to the Lower Acacia Reservoir, a 4MG <br />rectangular concrete tank predominately buried constructed in 1964. <br />13th Street Underground Reservoir Structural Retrofit, City of Ontario, CA <br />2012 — Mr. Yuen served as Structural Design Engineer for this project. The <br />primary objective of this project was to reduce the potential damages to the <br />reservoirs in the aftermath of an earthquake that may jeopardize public safety <br />both in the local Upland neighborhood they are located in or the Ontario <br />community they serve miles away. <br />In 2008, the City had a Reservoir Seismic Vulnerability Evaluation Report <br />(Seismic Report) performed by Tetra Tech on all of its reservoirs to determine <br />their ability to resist current seismic code loads. The Structural Evaluation of the <br />Report evaluated each of the seismic force resisting components of each of the <br />reservoirs and provided seismic retrofit recommendations for those found to be <br />deficient. The recommended retrofit recommendation for the 13th Street <br />Reservoir is a cast -in -place reinforced concrete overlay which is added to the <br />walls, roof, and floor of each reservoir. <br />The Preliminary Engineering Design Phase will include the necessary <br />engineering services that will confirm the findings and recommendations of the <br />2008 Seismic Report (or recommend another less time consuming, cost-effective <br />alternative) and result in the production of the a Preliminary Design Report <br />(PDR) and preliminary design drawings that will be used as a basis for the Final <br />Design and ultimately, the Final Construction Documents. <br />Project Role: <br />Project Manager <br />Education: <br />M.S., Civil and Structural <br />Engineering, California State <br />Polytechnic University, Pomona <br />2016 <br />B.S., Civil Engineering, California <br />State Polytechnic University, <br />Pomona, 2007 <br />Reg istrations/Certifications: <br />Professional Engineer, California <br />2009, No. 75983 <br />Structural Engineer, California <br />2014. No. 6177 <br />Structural Engineer, Oregon <br />2019, No. 94532PE <br />Professional Engineer, Colorado <br />2019, No. 56159 <br />Cal DES Safety Assessment <br />Program Evaluator Training <br />Professional Affiliations: <br />American Institute of Steel <br />Construction <br />Field Safety Certifications <br />Fall Protection (Ladders, <br />Scaffolding, Aerial Lifts) <br />3/2018 <br />H'S Protection Training <br />Respiratory Protection Training <br />Confined Space Training <br />(912019) <br />Office: <br />San Dimas, California <br />Years of Experience: <br />(2007) 12 <br />Years with Tetra Tech: <br />(2007) 12 <br />Pig <br />
The URL can be used to link to this page
Your browser does not support the video tag.