Laserfiche WebLink
N <br />TETRATECH Geoffrey Heinen, EIT <br />Structural Design Engineer <br />Mr. Heinen has experience in the design, analysis and detailing in structural <br />engineering. He is knowledgeable in reinforced concrete, masonry, structural steel and <br />wood frame design, and construction for a variety of building and infrastructure <br />projects including reservoirs, water/wastewater treatment facilities, as well as seismic <br />retrofit of existing structures. <br />EXPERIENCE <br />Hunting Horn Reservoir Structural/Seismic Evaluation, City of North Tustin, CA, <br />Golden State Water Company, 2019 As Design Engineer, Mr. Heinen assisted with <br />engineering/technical services including onsite reconnaissance inside the reservoir to <br />prepare a structural and seismic study and evaluation. The Hunting Horn Reservoir is a <br />semi -buried reinforced concrete cylindrical water tank that was first constructed in <br />1900, converted to concrete in 1918, and gunite-lined in 1950. The reservoir has a <br />capacity of 0.44 MG, measures approximately 72 feet in diameter and 16 feet high and <br />has a wood frame roof. Over the years it has developed cracks in the interior shell that <br />have been patched and has a slow leak that is visible from the exterior and requires <br />assessment and repair. Tetra Tech prepared a comprehensive engineering study and <br />seismic evaluation of the tank to examine the alternatives available to GSWC for either <br />repair or replacement. <br />Reynolds Ranch Reservoir Construction Phase, City of Vacaville, CA, 2016 — <br />Tetra Tech provided construction support services to assist in the submittal review as <br />well as providing technical assistance in answering RFls an assist with resolution of <br />change order requests. Mr. Heinen assisted with the review of construction submittals <br />and RFIs. <br />3.7 Million Gallon Zone I Reservoir Construction Support Services, IRWD, <br />Irvine, CA 2018 - Zone I Reservoir Construction Phase — Mr. Heinen assisted with <br />structural calculations (prestressed tank, concrete vaults, retaining walls) detailing, <br />reviewing construction submittals, reviewing RFIs. <br />Project Role: <br />Structural Design Engineer <br />Education: <br />MS Structural Engineering <br />California State Polytechnic, <br />Pomona, CA <br />Expected 2020 <br />as Civil Engineering <br />Gonzaga University, Spokane, <br />WA 2015 <br />Registrations/Certifications: <br />Engineer -In -Training 2015 <br />Field Safety Certifications <br />Fall Protection (Ladders, <br />Scaffolding, Aerial Lifts) <br />3/2018 <br />H2S Protection Training <br />Respiratory Protection Training <br />Confined Space Training <br />(9/2018) <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office Location: <br />San Dimas, CA <br />Total Years of Experience: <br />(2ot7) 2 <br />Years with Tetra Tech: <br />(06/2017) 2 <br />Simon Ranch Reservoir, City of Tustin, CA 2015-2019 — Tetra Tech provided professional design engineering services <br />for the Simon Ranch Reservoir, Booster Pump Station and Pipeline Replacement Project. Mr. Heinen assisted with the <br />structural calculations (prestressed tank, screen/retaining walls) detailing, reviewing construction submittals, reviewing <br />RFI. <br />Lower Acacia Reservoir (1-D) Design Phase Services and Construction Management, City of Fullerton, CA 2018 — <br />Structural designer assisting with the Design Phase and Construction Support Services for the improvements to the Lower <br />Acacia Reservoir. Mr. Heinen assisted with the preparation of the drawings and specifications that comprise the bid <br />documents. <br />Sierra Madre Reservoir Rehabilitation, Glendora, CA 2016-2017 — Structural Designer assisting with the preparation of <br />a seismic evaluation of an existing 4 MG potable water storage tank. This concrete structure was originally constructed in <br />1964-65. The tank structure consists of a prestressed circular concrete wall shell, concrete columns and a concrete roof. The <br />purpose of the evaluation was to determine the improvements needed in order for the reservoir to meet current Code <br />(AW WA D 110-13) seismic design, and to determine the extent of the sagging and cracking at the existing roof deck. Safety <br />and reservoir appurtenances were evaluated for OSHA compliance (ladders and hatches) and security (hatches and vents). <br />Conceptual designs and costs for the recommended improvements were provided in a preliminary design report. <br />Preliminary Design Report for the San Jacinto Valley Water Banking— Enhanced Recharge and Recovery <br />Program, Eastern Municipal Water District, Final Design Well Building, 2018 — Tetra Tech prepared the 30% design <br />plans for this project and is currently completing the Phase IA final design plans and specifications for the well conveyance <br />and blow -off pipelines. Mr. Heinen assisted with the preparation of structural calculations (CMU Building w/ Steel Frame <br />Roof, Concrete Wall Footing), Detailing, Estimate. <br />Page 1 <br />