My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC-A-2020-075-06
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC-A-2020-075-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:36:11 AM
Creation date
5/6/2020 4:14:17 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC
Contract #
A-2020-075-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/1/2022
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEY PERSONNEL RESUMES <br />N11GUEL HERS I I I PLS, QSD <br />Project Manager - Huitt-Zollars <br />Miguel Hernandez has more than 20 years of experience in Public Works and is <br />proficient with the design of streets, highways, sewer, water, storm drain, grading, <br />hydrology and hydraulics. His experience combined with his ability to communicate <br />will make him a valuable asset to a project. As a Project Manager he will be helpful <br />in coordinating all design inclinations and finding the appropriate balance. When <br />critical deadlines need to be met his proven ability to work under pressure will be <br />invaluable. <br />RELEVANT PROJECT EXPERIENCE <br />Citywide Sanitary Sewer and Domestic Improvements - Santa Ana, CA' <br />Mojave Solar Project - Hinkley, CA <br />Ensure all construction work conformed to applicable LORS, coordinated traffic <br />detour plans, reviewed QSP activities, prepared documents to initiate revisions to <br />approved drawings, responsible for work load reports and monitored progress of <br />construction schedule. The project moved over 750,000 CY of soil during the grading <br />activities that required coordination with survey crews and grading contractor. To <br />protect the site from large storm events and balance dirt moving activity 18,000 LF <br />of channel were cut. The solar plant included rehabilitation of six existing water <br />wells and drilling of four new water wells. Six existing water wells were used for <br />construction water. After construction, two large existing wells were retrofitted and <br />connected to four new water wells to provide water for domestic and power plant <br />use. The two power plants included four water tanks total. <br />Farragut Avenue Improvements - Moreno Valley, CA <br />Hernandez was the Project Manager for improvements that included sidewalk, <br />curb, gutters, driveways, drainage, access ramps, utility adjustments, short property <br />walls, missing street lights, pavement repairs, and accommodation of upgraded <br />water line (built in advance by BSMWC) in order to enhance safety and accessibility <br />for commuters and pedestrians on Farragut Avenue from Sherman Avenue to <br />Ellsworth Street. <br />Jeffrey Road/Portola Parkway Street Improvements - Irvine, CA <br />Hernandez was the Project Manager for the civil design and survey of a new <br />alignment of 1.5 miles of Jeffrey Road and 1.0 mile of Portola Parkway. Work <br />included roadway rehabilitation, electrical conduits, cable/telephone improvements, <br />right-of-way engineering, potholing, and grading. Work also included preparation <br />of infrastructure plans, including storm drain design, 72-inches to 10-inches in <br />diameter over 10,000 feet of pipe, hydrology and hydraulic calculations, sewer <br />plans, dry utilities, specifications, and construction cost estimates. Jeffrey Road <br />and Portola Parkway were designed for a six -lane highway with raised medians, <br />new curb and gutter to replace open ditch channels, pedestrian undercrossing. <br />Cerritos Avenue Gap Closure - Anaheim, CA <br />Hernandez was the Project Manager for this project located on Cerritos Avenue <br />from Euclid Street to approximately 600 feet east of Euclid Street. The project <br />constructed a five foot wide ADA compliant sidewalk and new storm drain laterals <br />with catch basins. The work also included the construction of block walls and <br />fences. <br />` Refer to page 9 for project description <br />HLllTTZOLLARS City of Santa On -Call Water Resources Engineering Services RFP No. 19-100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.