My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC-A-2020-075-06
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC-A-2020-075-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:36:11 AM
Creation date
5/6/2020 4:14:17 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC
Contract #
A-2020-075-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/1/2022
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed geometric studies, topographic surveys, and final construction <br />documents were prepared by Huitt-Zollars for this $5 million project to add one <br />through lane in each direction on Oso Parkway, right -turn -only lanes in each <br />direction on Marguerite Parkway, and create double left -turn lanes in all four <br />directions of the existing arterial highway intersection. Raised medians on all <br />four legs of the intersection were completely reconfigured. Design constraints <br />included access to existing developments, an adjacent hillside slope buttress, <br />major water pressure reducing station, and other utility vaults and facilities. This <br />project affected 4,600 linear feet of highway, three signalized intersections, and <br />included 1,700 linear feet of retaining walls. Construction plans, specifications, and estimates were prepared <br />for this $5 million project. The work of subconsultants for environmental documentation, traffic engineering, <br />landscape architecture, and cost estimating was coordinated by Huitt-Zollars. This project involved relocation of <br />numerous electrical, telephone, cable and gas utility facilities, and reinforcement of the underground vault for the <br />pressure reducing station. I � %IA „T ��1^ L, <br />CLIENT CONTACT: <br />City of Mission Viejo Public <br />Works <br />Mark Chagnon - Director <br />200 Civic Center Drive <br />Mission Viejo, CA 92691 <br />949.470.3091 <br />.......... <br />COMPONENETS: <br />Road Widening <br />Traffic Signals <br />Signage & Striping <br />Retaining Walls <br />Pavement Rehabilitation & <br />Overlay <br />Traffic Control/Construction <br />Huitt-Zollars was retained by Orange County Public Works to prepare <br />Letter of Design Recommendations (LODR) and final construction plans, <br />specifications and estimates for the improvement of the Oso Parkway / <br />Antonio Parkway intersection in South Orange County. The $2 million <br />project's purpose was to improve the capacity of this intersection to <br />accommodate increased traffic resulting from continued new residential <br />development throughout the region. Capacity improvements at the <br />intersection were as follows: <br />Antonio Parkway: Addition of a fourth southbound thru lane <br />and a third northbound left -turn lane onto Oso Parkway <br />Oso Parkway: Addition of a fourth eastbound thru lane <br />CLIENT CONTACT: <br />OC Public Works <br />Steve Soo - Project Manager <br />300 N. Flower Street <br />Santa Ana, CA 92703 <br />714.667.9659 <br />Right -of -Way <br />Storm Drain <br />Design, Geometrics & PS&E <br />Private PropertyAccess <br />Modifications <br />RELEVANT DESIGN <br />Traffic Control/Construction <br />COMPONENETS: <br />Phasing <br />Road Widening <br />Pavement Overlay/ <br />Traffic Signal <br />Rehabilitation <br />Signing & Striping <br />Design, Geometrics & <br />Right -of -Way <br />PS&E <br />HUITMJLLARS <br />City of Santa On -Call Water Resources Engineering Services RFP No. 19-100 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.