Laserfiche WebLink
REFERENCES <br />AKM Consulting Engineers has completed, and/or is currently working on construction management <br />assignments for the following clients. Contacts are listed for your reference to confirm the quality of <br />our work and responsiveness provided by AKM. <br />City of Long Beach — 333 W. Ocean Blvd., 9'" Floor, Long Beach, CA 90802 <br />Contact: Alvin Papa, City Engineer (562) 570-6383 alvin.papa(cDlong beach.gov <br />Project: On -Call Construction Management and Inspection Services <br />AKM Staff: E. Kayiran (PM/CM), S. Patterson (CM), M. Fredriksz (Inspector), C. Ervin (Inspector), <br />R. Harnisch (Inspector), N. Lowe (Inspector) <br />Construction Cost: $30,000,000 A/E FEE: $150,000 (TO DATE) Completion: Current <br />City of Cypress — 5275 Orange Avenue, Cypress, CA 90630 <br />Contact: Mr. Doug Dancs, Community Development Director (714) 229-6344 <br />ddancs @ci.cypress.ca. us <br />Project: On -Call Construction Management and Inspection Services <br />AKM Staff: E. Kayiran (PM/CM), S. Patterson (CM), M. Fredriksz (Inspector), C. Ervin (Inspector), <br />R. Harnisch (Inspector), N. Lowe (Inspector) <br />Construction Cost:$15,000,000 for projects completed to -date NE Fees:$1,300,000 Completion: <br />west basin mumcipai water ulstrict - 1 r14U S. Avalon Blvd., Suite 210, Carson, CA 90746 <br />Contact: Ms. Veronica Govea, Project Manager (310) 660-6269 veronicao(d_)westbasin.org <br />Project Title: On -Call Construction Management and Inspection Services <br />AKM Staff: E. Kayiran (PM/CM), S. Patterson (CM), M. Fredriksz (Inspector), D. Verone <br />(Inspector); C. Ervin (Inspector), R. Harnisch (Inspector), N. Lowe (Inspector) <br />Construction Cost: $20,000,000 A/E Fees: $1,800,000 (to date) Completion Date: Current <br />City of Fountain Valley - 17300 Mt. Herrmman Street, Fountain Valley, CA 92708 <br />Contact: Mr. Mark Lewis, Director of Public Works (714) 593-4435 mark. lewis @fountainvaHey.ong <br />Project Title: Reservoir 1 Booster Pump Station <br />AKM Staff: E. Kayiran (PM); G. Deiter (CM/Inspector) <br />Construction Cost: $4,000,000 AIE Fees: $400,000 Completion Date: 2016 <br />South Coast Water District - 31592 West Street, Laguna Beach, CA 92651 <br />Contact: Ms.Taryn Kjolsing (949) 499-4555 x 3171 tkiolsing(oilscwd.oro <br />Project Title: Lift Station NO. 6 Forcemain Replacement Project <br />AKM Staff: E. Kayiran (PM), S. Patterson (CM), M. Fredriksz (Inspector) <br />Construction Cost: $2,300,000 A/E Fees: $190,000 Completion Date: 2019 <br />FEE PROPOSAL <br />Rate schedule is being provided under separate file as requested in the RFP and on Planetbids. <br />This schedule is valid for three years. <br />CERTIFICATIONS <br />The forms requested in the RFP can be found in Appendix A, which include Non -Collusion Affidavit, <br />Non -Lobbying Certification, and Non -Discrimination Certification. <br />AKM Prop. 20-1004 <br />19 <br />