My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Kayiran, an AKM Construction Manager/Inspector, has a broad <br />�� �� <br />background in construction scheduling, management, and <br />�: �� <br />inspection. His background includes management and inspection of <br />i : i:i <br />the construction of pipelines, pump stations, treatment facilities, <br />Mr. Emin Kayiran, CPII <br />reservoirs, precast and cast -in -place concrete structures, protective <br />Role: Project Manager <br />coating and linings, electrical and control systems, instrumentation, <br />Director of Construction <br />cathodic protection; SCADA integration, management of hazardous <br />Management Services <br />materials removal, dewatering, shoring systems, ground settlement <br />Professional <br />monitoring, and street improvements. Mr. Kayiran's related project <br />Registration <br />experience includes: <br />Caltrans Resident <br />0 Equipping of Well 31 and Lampson Reservoir Booster <br />Engineering Academy; <br />Station Improvements for the City of Garden Grove — <br />APWA — Certified Public <br />Construction Manager and Resident Engineer— The Project included <br />Infrastructure Inspector <br />a new 500 HP, 3500 gpm deep well vertical turbine pump, installation <br />(Issued 312011); Qualified <br />of 16-inch steel discharge piping connecting to both the City's <br />Compliance Inspector of <br />distribution system and on site reservoirs, a roll -a -part well building <br />Stormwater California <br />to house the Well 31 electrical equipment and wellhead, installation <br />(Issued 2016 — Exp. <br />of electrical equipment including: 18-pulse VFD with by-pass solid <br />212612018) <br />state starter; single phase lighting transformer and motor control <br />Education <br />center; power monitor; and main disconnect, installing <br />B.S. in Business <br />instrumentation equipment including well level transmitter; high and <br />Administration; Finance <br />low discharge pressure switches; and discharge pressure <br />and Entrepreneurship, <br />transmitter; reprogramming of the existing Booster Station PLC and <br />University of Arizona, <br />development of control screens to accomplish variable speed <br />Tucson <br />operation and control of Well 31; conversion of two (2) existing <br />Civil Engineering Studies, <br />booster pumps to variable speed operation including two (2) new 200 <br />Civil <br />HP inverter duty motors and two (2) new VFDs; a new starter for the <br />Engineering/Construction <br />booster station jockey pump; new 2000 amp MCC section; nitrate <br />Management, Cal State <br />sampling pump; re -pavement of the asphalt concrete throughout the <br />University, Long Beach <br />facility; and testing and commissioning of the facility. <br />Years of Experience. 15 a Inspection Services for the Citywide Recycled Water <br />Years with AKM: 15 Facilities Project "A" for the City of Corona — Deputy Resident <br />Engineer assisting Chief Resident Engineer with inspections for <br />various projects related to the City of Corona Recycled Water Facilities including 3 pre -stressed <br />concrete recycled water storage reservoirs, 142,000 linear feet of PVC and ductile iron pipelines; <br />service connections and appurtenances, 3 recycled water pump stations, and various <br />improvements to the existing tertiary treatment facilities. <br />• Navy Booster Station & Reservoir Upgrade for the City of Seal Beach — Construction <br />Manager for the project which included replacement of three (3) 100-hp, 1400-gpm, pumps with <br />new VFD operated pumps; new electrical, controls including a control panel and new telemetry <br />panel, integration of the new telemetry and control panel with the existing SCADA system, <br />installation of new discharge piping and valves, rehabilitation of an existing 3 MG steel reservoir <br />including interior/exterior recoating, installation of a new 12-inch CLA-VAL altitude valve, cathodic <br />protection, 1-year anniversary coating inspection of the reservoir; a new prefabricated metal <br />building to house the equipment, construction of an on -site chlorine generation facility, and a <br />prefabricated building to house the new chlorination system. <br />• Alamitos Seawater Barrier Improvement Project for the Orange County Water District — <br />Construction Manager and Inspector for the project which involves the drilling and equipping of <br />seventeen (17) injection wells including associated vaults, piping, valves electrical and SCADA <br />AKM Prop. 20-1004 Appendix B - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.