My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
utilities to the building. <br />• Demolition on Ellis Avenue — Project Manager - Abandonment of a City owned building <br />requiring demolition. Mr. Verone oversaw the lead and asbestos abatement. Demolition of the <br />houses including the removal of all utilites back to their origins. <br />• Murdy Fire Station — Project Manager - Work included commercial interior rehabilitation of a fire <br />station living quarters. Power grouting the entire stations slab to support the subteranian failure <br />was performed. Also, the slab was raised and fortified the facility <br />• Heliport Pilot Ready Room - Installed ADA restrooms with ADA accessible pathways <br />• Joint Powers Training Center - Commercial interior rehabilitation of the offices and restrooms, <br />including current ADA standards. <br />• Pacific Coast Highway Transit Center - Installed Concrete Functional Art in the shape of waves <br />for bus benches. <br />• Heil Fire Station Rehabilitation - Commercial interior rehabilitation construction of the fire station <br />living quarters. Work included interior and exterior components such as parking lot paving. <br />• Intrepid Lane Storm Drain — Project Manager for work which was the installation of a storm drain <br />in the backyards of residential homes that backed up to the bay. The project required extensive <br />coastal commission permits. <br />• Meredith Drive Storm Drain — Project Manager for work including residential drain upsizing. <br />• Beach Sewer Improvements — Project Manager for work which included a mile and half of 20- <br />foot deep, 24" sewerline. The project required coordination with Sanitation District for connection <br />and access to Beach Boulevard. Additional coordination with local businesses and nearby <br />residences was performed. <br />• Miscellaneous Sewer Rehabilitation — Project Manager for work which included pipelines <br />completed with Sancon fold and form PVC pipe liner. The project required coordination with <br />residences and constant inspection to assure all sewers were functioning properly after relining. <br />• Huntington Harbor Sewer Relining — Project Manager for work which required constant <br />supervision of the sewer lift station during reconstruction of the pipelines. This was due to lift <br />station being on an island. The project was completed with Insituform inverted glass sock. <br />• Sewer Lift Station at Pacific Coast Highway and Effingham — Project Manager for work <br />included construction of two sewer lift stations. The Pacific Coast Highway station required <br />extensive dewatering and the complete closure of the highway to accommodate the oversized <br />crane to install the wet well. The Effingham Station was a 30 foot deep station requiring major <br />over excavation and dewatering. <br />• Sewer Lift Station #26 at Brighton Drive and Shoreham Lane — Project Manager for work <br />included construction of a sewer lift station in a local park adjacent to residential homes. The <br />project required the park to remain open during construction and park rehabilitation afterwards <br />• Sewer Lift Station Replacement of Ranger Lift Station #16 - Project Manager - Ranger lift <br />station was located in a high water table area and required extensive dewatering. This lead to <br />lane closures on Adams Avenue a major interjurisdictional arterial highway. Due to the extensive <br />over dewatering, the Contractor had to power grout the surround area to save the highway and <br />adjacent homes. <br />• Algonquin Street Sewer Lift Station — Project Manager for work which included the construction <br />of a sewer lift station with two wet wells. It was located adjacent to a condo complex requiring <br />elevation monitoring. To further complicate the project, it was in the elementary schools path of <br />travel. <br />• Trinidad Lane Sewer Lift Station - Project Manager for the abandonment of the old station and <br />construction of the new station in the park adjacent to the residence and the bay. Work included <br />the construction of a diesel backup generator and required constant inspection and <br />documentation. <br />AKM Prop. 20-1004 Appendix B - 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.