My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coordination with Chevron Corporation, NRG, and the City of El Segundo for inspection during <br />pipeline excavation, installation, hydrostatic pressure testing, and backfill. <br />Myra 3 In -Line Detention Basin, Storm Drain, and Sewer Improvements for the City of <br />Cypress — Inspector for the project which consisted of removal and reconstruction of sewers, <br />cleaning and relining of existing sewers, constructing approximately 2000 feet of 13' (W) x 4.5' <br />(H) reinforced concrete box on Myra Avenue as well as a lateral storm drain system on <br />intersecting side streets; and reconstructing full sections of street pavement on Myra Avenue <br />between Bloomfield Street and Denni Street; removal and replacement of curb, gutter, cross <br />gutter, and spandrels at eleven (11) intersections; curb -ramps with detectable warning surface, <br />and grinding 2 inches of AC pavement and recapping of full street width along streets within the <br />tract that the project was constructed. <br />Ross Avenue Sewer Improvements Project for the City of Alhambra — Alternate Inspector <br />for the project which consists of the removal and disposal of approximately 1,700 linear feet of <br />existing 20" VCP sewer; removal and disposal of five (5) existing manholes; the installation of <br />approximately 1,700 linear feet of 21" extra strength VCP sewer including the trenching, bedding, <br />and pavement resurfacing; the construction of five (5) 60" sewer manholes including the <br />application of a polyurethane coating system to the interior manhole surfaces, connecting existing <br />sewer laterals to the new sewer main; backfill and re -compaction of the sewer trench; <br />reconnecting existing sewer manhole connections; mobilization, demobilization, traffic control <br />implementation and continuous bypass pumping during the construction of the new sewer main. <br />Sewer Main Repairs PW13-24 for the City of El Segundo — Resident Engineer/Inspector for <br />the work which consisted of traffic and safety control, and sewage flow bypassing, replacement <br />of 3022 LF of 8", 12" and 15" VCP sewer main with service connections. The work also included <br />excavation, sewer flow bypassing, crushed rock bedding, backfill, CCTV inspection of all <br />replacement and repairs, and temporary and permanent asphalt concrete paving. Provided full- <br />time construction inspection, testing, and overseeing the completion of work. <br />AKM Prop. 20-1004 Appendix B - 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.