My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC-A-2020-076-05
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC-A-2020-076-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:23:17 PM
Creation date
5/6/2020 4:17:34 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC
Contract #
A-2020-076-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
8/30/2021
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We Make o Difference <br />I N T E R N A T 1 0 N A L <br />FEE SCHEDULE <br />MICHAEL BAKER CONSTRUCTION MANAGEMENT PERSONNEL <br />$ / hr <br />Principal Construction Manager .............. .... ....... ..................................................... <br />$265.00 <br />Sr. Construction Manager ....................... ................................................................ <br />$225.00 <br />Construction Manager.............................................................................................$205.00 <br />ResidentEngineer .......................... .............. ....... .................................................... <br />$185.00 <br />Construction Inspector (Prevailing Wage)..............................................................$165.00 <br />FieldOffice Engineer....................................................... ........................................ <br />$145.00 <br />CMTechnician........................................................................................................$125.00 <br />Construction Coordinator........................................................................................$110.00 <br />MICHAEL BAKER OFFICE PERSONNEL <br />$ / hr <br />ProjectPrincipal......................................................................................................$285.00 <br />Senior Project Manager ..................................... ..................................... <br />................ $265.00 <br />Project Manager/Senior Structural/Electrical Engineer ................................... <br />....... .$230.00 <br />SeniorEngineer......................................................................................................$195.00 <br />Electrical / Civil Engineer........................................................................................$185.00 <br />Project Engineer / Project Planner / Permit Specialist............................................$175.00 <br />Environmental Specialist.........................................................................................$165.00 <br />MICHAEL BAKER SURVEY PERSONEL <br />$ / hr <br />2-Person Survey Crew............................................................................................$287.00 <br />1-Person Survey Crew........................................................................................... <br />$190.00 <br />Licensed Surveyor .... ............................................................................................. <br />$205.00 <br />FieldSupervisor......................................................................................................$195.00 <br />These rates are valid through December 30, 2020 and will increase by 5% per year. Inspection rates <br />are based on a 4-hour per day minimum. Blueprinting, reproduction, messenger service, <br />subconsultant services, and other direct expenses will be charged as an additional cost plus 15%. <br />Mileage at IRS Rates. <br />MBAKERINTL.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.