My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT UNDERSTANDING <br />NV5 is a well -established engineering design firm with extensive experience in the City. In particular, we have a <br />great track record helping public agencies and municipalities achieve their Capital Improvement Program goals <br />through our effective on -call support. We provide professional, comprehensive engineering services on a per <br />project or task order basis for all types of capital improvement projects. Below is our general project approach <br />that will be modified and tailored to meet each project's needs. <br />Ability tol <br />Maintain <br />Close Working <br />Relationships <br />Able to <br />Understanding <br />with City <br />Oversee, <br />+ Delivering <br />Staff <br />Manage + <br />Upon the Need <br />Control <br />of the City <br />Schedules <br />and Cost <br />strong Design <br />Dedicated <br />Background <br />+ Qualified <br />+ Relevant <br />WHAT MAKES NV <br />Professional <br />Team <br />Experience <br />UNIQUELY QUALIFIED <br />TO PROVIDE <br />Members <br />THESE <br />SERVICES TO THE CITY? <br />IF <br />r WORK APPROP <br />Upon issuance of a notice to proceed, our Project Manager will meet with team members to review the <br />requirements, prepare a Work Breakdown Structure and make team assignments for maximum efficiency of <br />resources. The detailed WBS will describe all of the work tasks necessary to complete the project. A master <br />project schedule will be prepared following the WBS to show the relationship between tasks, the expected start <br />date and duration for each item. This schedule will serve as a guide to conducting and monitoring the progress <br />of the work and to assure projects are completed on time and within budget. NV5 will meet with the City's <br />Project Manager regularly and maintain constant communication to assure successful and timely delivery <br />of the project. Meeting minutes will be distributed within one week of the meeting, identifying actions, items, <br />assignments and due dates. <br />0 1 COST CONTROL <br />We continually review and evaluate a project's cost through all project phases to enable informed and timely <br />decision -making by our clients and the entire project team. Cost control techniques include program budget <br />analysis, value engineering, life -cycle cost analysis, and quantity -based estimating. We rely on an open -book, <br />inclusive process that demonstrates the costs and benefits of varying design options. This budget confirmation <br />process starts in the earliest stages of the project, when design and engineering alternatives have the greatest <br />potential impact on costs. Our design team analyzes client goals, technical requirements, alternative building <br />concepts, construction costs and long-term operational costs to define the optimum scope within the budget, <br />assuring long-term flexibility and value. <br />
The URL can be used to link to this page
Your browser does not support the video tag.