My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO CHARLIE WKINLEY, PE <br />charli <br />e.mckinley@ nv5.cPro ect Director/Project Mana er <br />nv5.com 1g <br />EXPERIENCE Mr. McKinley has more than 30 years of experience as a professional engineer <br />30 years for both large-scale capital improvement projects and small infrastructure <br />EDUCATION improvement projects. He has a broad range of project experience with a focus <br />B.S. Biomedical on pipelines, pump stations, reservoirs and treatment. Mr. McKinley brings an <br />Engineering enthusiastic approach to planning, regulatory permitting, detailed design and <br />LICENSES operations review to facilitate civil and environmental engineering projects. <br />Civil Engineer (CA) Project Experience <br />No. C38484 .......... - --- <br />AFFILIATIONS Sewer Main Improvements <br />Member, Board of CITY OF SANTA ANA I SANTA ANA, CA <br />Directors, Society Project Manager. Mr. McKinley is overseeing the team providing engineering <br />of American Military design services for the Old Grand Street, Santa Clara Avenue and Wright <br />Engineers, Orange Street Sewer Main improvements and Flower Street, 17th Street and <br />County Post Greenleaf Street Sewer Main Improvements projects. The projects consist of <br />Member, American Public replacing existing sewer pipe, related laterals and manholes. Existing sewer <br />Works Association laterals will be replaced to the edge of the right-of-way to each property line. <br />Services include preparation of plans, specifications and cost estimates, <br />Inland Empire Chapter topographic survey, manhole details and utility research/investigation. <br />President, WateReuse <br />Association Bristol Street Water Main Improvements <br />AVAILABILITY CITY OF SANTA ANA I SANTA ANA, CA <br />60% Project Manager. Mr. McKinley is overseeing the team providing engineering <br />design services for the Bristol Street Water Main Improvements project. <br />Services include preparation of plans, specifications and cost estimates, <br />including environmental support services and geotechnical engineering <br />services. The project consists of replacing approximately 2,600 LF of existing <br />water main and water -related appurtenances in South Bristol Street, between <br />Warner Avenue and St. Andrews Place. The existing water main is located in <br />the east (northbound) side of the street in the right-hand slow lane. Existing <br />water services will be extended to connect to the new main after it has been <br />tested and disinfected, while the existing main will be abandoned in place. <br />Existing hydrants and other appurtenances (blow -offs, air vac valves) will be <br />replaced in their current locations with currently approved facilities. <br />PCH Water Main Replacement <br />CITY OF LOMITA I LOMITA, CA <br />Project Manager. Mr. McKinley is responsible for the preparation of plans, <br />specifications and cost estimates for the design of the PCH water main <br />replacement project from Narbonne Avenue to Eshelman Avenue. This project <br />consists of replacing the existing dual 6-inch water mains and includes the <br />installation of fire hydrants, service laterals, valves, blow -offs, air release <br />valves, and other associated water appurtenances. <br />Reverse Osmosis Water Treatment Plant <br />CITY OF BEVERLY HILLS I BEVERLY HILLS, CA <br />Project Manager. Mr. McKinley is leading the team responsible for serving as <br />V 5 the City's (Owner's) Representative during the design -build of a pre-treatment <br />
The URL can be used to link to this page
Your browser does not support the video tag.