Laserfiche WebLink
CONTACTINFO <br />KAITLYN LEONG, PE <br />kaitlyn.leong@nv5.com <br />Hydrology/Hydraulic Studies <br />EXPERIENCE.................................................................................................................................................................................... <br />5 years <br />Ms. Leong has worked on numerous water and wastewater projects for various <br />EDUCATION <br />agencies throughout the state. She is skilled in a number of modeling and <br />B.S. Civil Engineering <br />design programs, including AutoCAD, HEC-RAS and GIS. <br />LICENSES/ <br />Project Experience <br />CERTIFICATES............................................................................................................-. <br />..................................................................... . <br />Civil Engineer (CA) <br />Drainage Study <br />No. 89478 <br />STANFORD UNIVERSITY I PALO ALTO, CA <br />REGISTRATIONS <br />Hydraulic Analysis. Ms. Leong performed hydrology and hydraulic analysis <br />Certified NASSCO PACP/ <br />to analyze overland release conditions for the east side of the campus at <br />LACP/MACP <br />Stanford University. She identified drainage areas and performed drainage <br />AVAILABILITY <br />calculations using HEC-RAS. <br />60% <br />Miscellaneous Water and Sewer Main Replacement Project <br />CITY OF MOUNTAIN VIEW I MOUNTAIN VIEW, CA <br />Staff Engineer. Ms. Leong served as Staff Engineer for the design services <br />for the City of Mountain View's current sewer and water main replacements <br />project. Design included replacement of 5,280 lineal feet of 4-inch and 6-inch <br />cast iron water mains with PVC pipe material with a conventional open trench <br />method. Design also included replacement of 4,840 lineal feet of 6-inch <br />and 8-inch sewer mains with the pipe bursting method. Ms. Leong reviewed <br />CCTV records and videos of the existing sewer condition and provided <br />recommendations of a best replacement method based on the existing sewer <br />condition. Pipe burst methods were employed where feasible based on a <br />review of sewer conditions from the CCTV investigation. <br />Tejon Mountain Village Water Supply Facility Plan <br />KERN COUNTY, CA <br />Staff Engineer. Ms. Leong served as Staff Engineer for this 7,800-acre <br />development encompassing approximately 3,450 single-family units as well as <br />recreational, commercial and hotel facilities and agricultural areas. Engineering <br />assistance on the project will involve multiple phases of design, with the initial <br />phase including research; outreach to local and state agencies; development <br />of demand factors and water budgets/supply options; and proposed major <br />backbone infrastructure facilities siting and pipeline routing, including water <br />conveyance, storage and treatment. Infrastructure requirements were divided <br />into those necessary for the first tentative tract map development area <br />(approximately 750 residential units, a hotel, 70,000 square feet of commercial <br />facilities, and various open space/agricultural areas) and final buildout. The <br />overall project is divided into six tentative tract maps and 18 phases. <br />North Kaweah Mutual Company Water Supply and Consolidation Project <br />CITY OF THREE RIVERS I THREE RIVERS, CA <br />Staff Engineer. Ms. Leong was responsible for planning, design and <br />construction management in a mountainous area to consolidate two water <br />systems, install approximately 10,600 feet of 6- and 8-inch water lines, fire <br />hydrants, a new 120,000-gallon storage tank, pressure -reducing station, <br />two new shallow wells, a 25-gpm water treatment plant, and new electrical <br />services. <br />