My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO JAMES OWENS, PE, LEED AP <br />james.owens@nv5.com <br />858.385.2187 Special Engineering Studies/Financial + Economic Services <br />EXPERIENCE <br />Mr. Owens leads a variety of water and wastewater projects during the <br />16 years <br />troubleshooting, conceptual design, planning, financing and design phases. <br />EDUCATION <br />He is experienced in performing population and demand projections, hydraulic <br />M.B.A. Business <br />analysis and design, project and system financial analysis, and the planning <br />Administration <br />and design of facilities. Mr. Owens is fluent in Spanish and has had success in <br />acquiring funding for communities to improve water and wastewater systems. <br />B. S. Civil Engineering <br />He has prepared numerous planning and design projects for CDBG, SRF, <br />LICENSES/ <br />BECC, NADBank, Proposition 50, Proposition 84, and USDA for numerous <br />CERTIFICATES <br />communities along the California/Mexico border and throughout the state. <br />Civil Engineer (CA) <br />No. C66067 <br />project Experience <br />............................................................................................................................................................................... <br />LEEDAP <br />Water and Wastewater Master Plan and Rate Study <br />AVAILABILITY <br />CITY OF EL CENTRO I EL CENTRO, CA <br />40% <br />Mr. Owens developed the water portion of the master plan, including <br />demographic projections, description and evaluation of existing facilities, <br />identification of deficiencies, development of solution alternatives, evaluation <br />and recommendation of alternatives, and development of a capital <br />improvement plan with projects totaling more than $10M. He determined <br />necessary rate changes to customers working with City staff to finalize the <br />capital improvements schedule, personnel additions, existing and projected <br />debt service, and other expenses. <br />Lucerne Valley Water and Wastewater Preliminary Planning Document <br />LUCERNE VALLEY, SAN BERNARDINO COUNTY, CA <br />Project Manager. Mr. Owens served as Project Manager for a preliminary plan <br />of conceptual layout development for a proposed water and sewer district <br />east of Victorville. He researched and presented data on groundwater quality, <br />existing facilities, and potential users. He oversaw estimate of current water <br />demand and wastewater generation, as well as projection of demands in <br />proposed district boundaries. <br />Amendment to Preliminary Engineering Report: <br />NILAND SANITARY DISTRICT I NILAND, CA <br />Mr. Owens prepared amendment to the preliminary engineering report <br />and environmental documentation to receive $800,000 in grant funding <br />for construction. Worked with Imperial County Planning and Development <br />Department to obtain grant for design of wastewater improvements. He <br />also served as the project manager for cleaning and video inspection of <br />approximately 15,000 LF of gravity sewer pipeline. <br />Ocotillo Water Pipeline Improvements <br />COYOTE VALLEY MUTUAL WATER COMPANY <br />Mr. Owens oversaw the geotechnical investigation, topographical and mapping <br />survey, and civil drawings of a 5,000 LF potable water pipeline that connects <br />two water companies in Imperial County. Mr. Owens helped the water <br />companies secure more than $800K in grant funds from the County Planning <br />N V 5 Department and USDA to pay for the pre -design, design and construction. He <br />also coordinated the bridge loan to support the design and bidding stages. <br />
The URL can be used to link to this page
Your browser does not support the video tag.