Section 3 — Understanding of Need S <br />✓ Analysis of issues: change order impacts or potential problems on schedule and budget progress, time of <br />completion, weather/rain days, delays and time extensions, and submit to contractor and the City on a <br />weekly basis. The weekly statement of working days is typically discussed and agreed upon at each <br />progress meeting and transmitted as an attachment to the minutes. <br />Schedule Review: W&A is very familiar with the mainstream scheduling software used by the public works <br />contracting industry including, but not limited to, Primavera P70, Suretrak® and Microsoft Project®. The W&A <br />Inspector will review the baseline construction schedule, including activity sequences and duration, schedule of <br />submittals and schedule of delivery for products with long lead-times. The schedule will not be approved as the <br />baseline until all discrepancies are resolved. The CM team will evaluate the baseline project schedule for the <br />following: <br />✓ Consistency with the contract schedule <br />(completion within the contract time) <br />✓ Accurate start dates, completion dates, other <br />dates detailed in the contract <br />✓ Any impacts of weather and change orders <br />✓ Sufficient detail — including submittal process and <br />procurement requirements <br />✓ Sequence of construction and correct schedule <br />logic <br />✓ Identification of the critical path and project float <br />✓ Cost spread allocation <br />Schedule Control: During the progress of construction, the W&A team will compare the contractor's monthly <br />schedule updates to the baseline schedule and any approved time extensions, note any shortcomings and <br />monitor and track corrections by the contractor to keep the project schedule on track. A four week `look -ahead" <br />schedule will be required from the contractor, updated weekly and presented at the weekly construction <br />progress meetings. This tool will keep the entire team looking one month ahead of the project and will facilitate <br />proactive handling of project activities and issues. If necessary, W&A will negotiate time extensions due to <br />change orders or other delays. <br />Photographs: W&A will prepare and maintain an electronic photo journal documenting the construction <br />progress. Photos will be taken before construction begins, during construction and upon completion of the <br />project. The project will be videoed as well for full capture of all detail prior to construction starting. This is <br />important at the individual residences with separate agreements with the City for easement work. <br />Contract Conformance: W&A will visit the site during the normal working hours (and when critical activities <br />warrant it) to verify construction progress and to verify that all work conforms to contract requirements. Deputy <br />and special inspection and materials sampling and testing will be coordinated and provided as required by the <br />final plans and specifications. W&A will reject work that does not conform to the requirements of the contract <br />documents and will promptly report unacceptable work to the City and contractor. Rejected work will be <br />thoroughly documented, photographed, and tracked until repaired or replaced to the satisfaction of the City. <br />QA/QC: W&A will enforce the quality assurance plan, in conformance with the City's Quality Assurance <br />Manual, or as developed by W&A and the City for the specific needs of the project prior to the start of work. <br />W&A will perform and/or coordinate QA/QC activities daily and review activities as they happen, to make sure <br />that QA/QC procedures are followed, and deficiencies are resolved in a timely and efficient manner. The CM <br />will maintain a chronological log of all records. <br />Change Orders: W&A will establish, implement, and coordinate systems for processing all contract change <br />orders. Each issue which is identified as a potential change to the design, scope, cost or contract time will <br />generate a change notice. The CM will determine whether a change notice should be considered. The plans <br />and specifications will be reviewed against the change notice. If the issue does not appear to be included in the <br />plans or specifications, a Request for Quotation (RFQ) will be sent to the contractor. Any credits for work <br />deleted because of the change will be required then as well. The contractor's response to the RFQ will be <br />evaluated for reasonableness and completeness. The CM will maintain a Trend Log, listing potential changes <br />as identified, either formally or informally. This Trend Log will be used such that potential change items are not <br />overlooked or deferred until the end of the job. W&A will prepare independent cost estimates as required for <br />contract change orders. Upon approval by the City, the Inspector will prepare, log and process change orders <br />for full execution, and administer their implementation. Once fully executed, the CM Team will review the timely <br />completion of the work and coordinate inclusion of the change order in the appropriate payment application. <br />V111acepAssociates <br />.... City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 13 <br />