Section 4 — Relevant Project Experience
<br />• Replacement Booster Station 305 ($4.2M) 2019 • New Residential and Commercial
<br />• Reservoir 4606-1 Construction ($4.4M) 2017 ($ Varies)
<br />• Well Nos. 5620-2 & 4520-2 ($2M) 2016 • Adams Street Crossing and Storm
<br />• Cathedral City Pipeline Improvements ($1M) 2016 2015
<br />As -Needed Project Management, Construction Management and Inspection
<br />City of Rialto, CA (Jul 2015 — Present)
<br />Related Elements
<br />Full time CM and Inspection services
<br />W&A Key Staff
<br />Contract Manager: Carl Wallace, PE
<br />PM/CM: Bryan Tuschhoff, QSP, PMP,
<br />CMIT, John Reidinger, CCM
<br />Construction Manager: John Reidinger,
<br />CCM, Pete Ayala, CMIT, Gary McCredie,
<br />CMIT
<br />Inspectors: Pete Ayala, CMIT, Eric
<br />Maher, QSP, David Zamiski, Tom
<br />Mitchell, Tom Hall, Rick Wiggins
<br />Special Inspections: Jin Chong, ]CC,
<br />AWS
<br />Labor Compliance: Heidi Nesper,
<br />Rachael Highley
<br />Certified Payroll Auditor: Kim Brown
<br />Client Contact
<br />Hector Gonzales, PE
<br />Principal Civil Engineer
<br />(909) 421-4986
<br />hgonzalez@rialtoca.gov
<br />q�d
<br />h
<br />Development
<br />Drain ($700K)
<br />W&A assists the City by providing Project Management, Construction
<br />Management and Inspection services on CIP projects, industrial and
<br />commercial developments. The construction of these developments
<br />includes mass grading and installation of sewer, water and storm
<br />drains. Inspectors also prepare daily reports with photographs, attend
<br />meetings and work with the City and contractors to remediate any
<br />concerns or issues. Construction management and inspection projects
<br />include:
<br />• Fire Station 205 Phase 1 ($4.2M) 2019
<br />• Fire Station 205 Phase 2 ($3.1 M) Ongoing
<br />• 2018/19 Citywide Roof Repairs ($700K) 2019
<br />• Metrolink Parking Lot Expansion ($1.1 M) 2019
<br />• Rialto Community Center ADA Upgrades ($390K) 2019
<br />• El Rivino Street Storm Drain ($2.7M) 2019
<br />• Joe Sampson Park ($5.2M) 2018
<br />• Development Projects - Recent and/or current projects include:
<br />• Amazon Distribution Warehouse ($90M) 2019
<br />• Renaissance East Development ($50M) 2019
<br />• Monster Energy ($85M) 2017
<br />• Fedex Ground Expansion ($25M) 2018
<br />• I-210 Logistics Center ($300M) 2018
<br />On -Call Construction Management and Inspection for Development and CIP projects
<br />Elsinore Valley Municipal Water District,
<br />CA (2016 — 2020)
<br />Related Elements
<br />W&A and its staff provides Construction Management and Inspection
<br />Construction Management services on
<br />services to the District on an as -needed basis for development and
<br />water related projects
<br />capital projects. Specific projects include:
<br />W&A Key Staff
<br />• AMI 40,000 Meter Replacement Project ($2.6M) 2017
<br />AMI Meter Project
<br />. Waite Street Reservoir Project ($2.51M) 2015
<br />Project Manager: Carl Wallace, PE
<br />Construction Manager: Bryan Tuschhoff,
<br />On -Call Construction Inspection Services for Land Development and
<br />CMIT, PMP, QSP
<br />CIP projects including:
<br />Inspectors: Jin Chong, ICC, AWS, Bill
<br />• Westlake Homes 33267 (Pardee Homes) ($7.4M) Ongoing
<br />Eckman, Rick Hanks, David Babcock,
<br />• The Cottages on Mission Trails 143 Multi Family ($24M) Ongoing
<br />David Zamiski, Tom Mitchell, Gary
<br />McCredie, CMIT
<br />. Summerly Homes Tract 31920 ($5M) Ongoing
<br />Waite Street Reservoir Project
<br />• Collier Honda Dealership ($1M) Ongoing
<br />Construction Manager: Paul Allison,
<br />CMIT
<br />Construction Inspector: David
<br />Valenzuela, EIT
<br />Land Development Projects:
<br />Construction Inspectors: David Zamiski,
<br />Rick Wiggins
<br />Client Contact
<br />Mayra Cabrera, PE
<br />Project Manager
<br />(951) 674-3146 x 8349
<br />mcabrera@evmwd.net
<br />I'.�Ilace. Msaclares City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 20