Laserfiche WebLink
Section 4 — Relevant Project Experience <br />• Replacement Booster Station 305 ($4.2M) 2019 • New Residential and Commercial <br />• Reservoir 4606-1 Construction ($4.4M) 2017 ($ Varies) <br />• Well Nos. 5620-2 & 4520-2 ($2M) 2016 • Adams Street Crossing and Storm <br />• Cathedral City Pipeline Improvements ($1M) 2016 2015 <br />As -Needed Project Management, Construction Management and Inspection <br />City of Rialto, CA (Jul 2015 — Present) <br />Related Elements <br />Full time CM and Inspection services <br />W&A Key Staff <br />Contract Manager: Carl Wallace, PE <br />PM/CM: Bryan Tuschhoff, QSP, PMP, <br />CMIT, John Reidinger, CCM <br />Construction Manager: John Reidinger, <br />CCM, Pete Ayala, CMIT, Gary McCredie, <br />CMIT <br />Inspectors: Pete Ayala, CMIT, Eric <br />Maher, QSP, David Zamiski, Tom <br />Mitchell, Tom Hall, Rick Wiggins <br />Special Inspections: Jin Chong, ]CC, <br />AWS <br />Labor Compliance: Heidi Nesper, <br />Rachael Highley <br />Certified Payroll Auditor: Kim Brown <br />Client Contact <br />Hector Gonzales, PE <br />Principal Civil Engineer <br />(909) 421-4986 <br />hgonzalez@rialtoca.gov <br />q�d <br />h <br />Development <br />Drain ($700K) <br />W&A assists the City by providing Project Management, Construction <br />Management and Inspection services on CIP projects, industrial and <br />commercial developments. The construction of these developments <br />includes mass grading and installation of sewer, water and storm <br />drains. Inspectors also prepare daily reports with photographs, attend <br />meetings and work with the City and contractors to remediate any <br />concerns or issues. Construction management and inspection projects <br />include: <br />• Fire Station 205 Phase 1 ($4.2M) 2019 <br />• Fire Station 205 Phase 2 ($3.1 M) Ongoing <br />• 2018/19 Citywide Roof Repairs ($700K) 2019 <br />• Metrolink Parking Lot Expansion ($1.1 M) 2019 <br />• Rialto Community Center ADA Upgrades ($390K) 2019 <br />• El Rivino Street Storm Drain ($2.7M) 2019 <br />• Joe Sampson Park ($5.2M) 2018 <br />• Development Projects - Recent and/or current projects include: <br />• Amazon Distribution Warehouse ($90M) 2019 <br />• Renaissance East Development ($50M) 2019 <br />• Monster Energy ($85M) 2017 <br />• Fedex Ground Expansion ($25M) 2018 <br />• I-210 Logistics Center ($300M) 2018 <br />On -Call Construction Management and Inspection for Development and CIP projects <br />Elsinore Valley Municipal Water District, <br />CA (2016 — 2020) <br />Related Elements <br />W&A and its staff provides Construction Management and Inspection <br />Construction Management services on <br />services to the District on an as -needed basis for development and <br />water related projects <br />capital projects. Specific projects include: <br />W&A Key Staff <br />• AMI 40,000 Meter Replacement Project ($2.6M) 2017 <br />AMI Meter Project <br />. Waite Street Reservoir Project ($2.51M) 2015 <br />Project Manager: Carl Wallace, PE <br />Construction Manager: Bryan Tuschhoff, <br />On -Call Construction Inspection Services for Land Development and <br />CMIT, PMP, QSP <br />CIP projects including: <br />Inspectors: Jin Chong, ICC, AWS, Bill <br />• Westlake Homes 33267 (Pardee Homes) ($7.4M) Ongoing <br />Eckman, Rick Hanks, David Babcock, <br />• The Cottages on Mission Trails 143 Multi Family ($24M) Ongoing <br />David Zamiski, Tom Mitchell, Gary <br />McCredie, CMIT <br />. Summerly Homes Tract 31920 ($5M) Ongoing <br />Waite Street Reservoir Project <br />• Collier Honda Dealership ($1M) Ongoing <br />Construction Manager: Paul Allison, <br />CMIT <br />Construction Inspector: David <br />Valenzuela, EIT <br />Land Development Projects: <br />Construction Inspectors: David Zamiski, <br />Rick Wiggins <br />Client Contact <br />Mayra Cabrera, PE <br />Project Manager <br />(951) 674-3146 x 8349 <br />mcabrera@evmwd.net <br />I'.�Ilace. Msaclares City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 20 <br />