Carl Wallace, PE
<br />Project Manager
<br />Mr. Wallace has over 28 years of experience in managing public works
<br />infrastructure, water and construction programs for several public entities
<br />and is highly experienced in managing large scale projects during design
<br />and construction phases. He brings strong understanding of local, state
<br />and federal funding requirements, Caltrans LAPM, Greenbook Standards.
<br />Since starting W&A in January of 2010, Carl provides project and contract
<br />management services, as well as oversees all QA activity. He ensures the
<br />success of each project and provides support to both clients and
<br />personnel. His key responsibilities have included managing capital
<br />construction projects ranging from small projects to major programs with
<br />construction values up to $500M. Specific responsibilities have included
<br />staffing, management, project delivery, on -time performance, adherence to
<br />jurisdictional requirements, hiring and managing other consultants for
<br />tasks involving testing, project controls, inspection, resident engineering
<br />and claims management, and he has personally performed these same
<br />duties for a variety of local, state and federal projects.
<br />On -Call Construction Management and Inspection Services, City of
<br />Fullerton, CA
<br />Project Manager providing Construction Management and qualified
<br />inspectors for a variety of Capital Improvement projects. Projects include
<br />street rehabilitation, traffic signal and intersection, water and sewer
<br />improvements, storm drain facilities, landscaping and irrigation. Oversees
<br />and monitors inspection staffing and provides Quality Assurance for our
<br />staff. Projects include:
<br />Experience
<br />28 years
<br />Education
<br />BS, Engineering; San Diego State
<br />University
<br />Registrations
<br />Registered Civil Engineer, CA
<br />#C59307
<br />Certifications
<br />Caltrans Resident Engineers
<br />Academy
<br />FTA Grant Management
<br />40-hour HAZMAT Training
<br />10-hour OSHA Training
<br />Affiliations
<br />American Society of Civil Engineers
<br />American Public Works Association
<br />Construction Management
<br />Association of America - Past
<br />Board Member
<br />American Water Works Associates
<br />American Construction Inspectors
<br />• Valencia Drive Infrastructure Improvements ($1.54 — Work involves traffic control, water shut downs
<br />and tie-ins, grinding and repaving, and infrastructure improvements.
<br />• Chapman Avenue Rehabilitation ($1.5M) — Street and sidewalk improvements that include potholing,
<br />grading, reconstruction and traffic control.
<br />• 4300 N. Harbor Boulevard ($2.5M) — On and off -site improvements for a new development. Work
<br />includes grading, paving, ADA sidewalk and ramps, curbs, gutters and driveways.
<br />On -Call Construction Management and Inspection Services, City of Huntington Beach, CA
<br />Contract Manager overseeing the Construction Management, Inspection, Administration and Labor
<br />Compliance services on a task order basis for State -Funded, Federally -funded and non-State/Federally-
<br />funded capital improvement projects. This initial three-year contract includes various public works
<br />infrastructure projects such as traffic signals, pump stations, lift stations, curb, gutter, sidewalks, pipelines,
<br />structures, road rehabilitation and bridge retrofits. Specific projects include:
<br />• Edgewater Sewer Lift Station Project ($3.5M) — The abandonment and demolition of an existing sewer
<br />lift station, and the installation of a new 1000 gpm submersible sewage lift station and force main
<br />• Traffic Signal Improvements at the intersections of Main St at 17th St/Utica Ave, and Bolsa Chica St at
<br />Pearce Dr ($540K) — Adds a protected left turn phasing and constructing ADA compliant ramps, and
<br />the installation of a new traffic signal
<br />• Various Signalized Intersections ($ Varies) — Installation of protected left turn phasing, traffic signal
<br />poles and interconnect conduit and fiber optic cable
<br />• 2019 Pavement Rehabilitation ($2M) — Rehab of pavements on three streets with wearing surface
<br />course of fiber -reinforced rubberized asphalt concrete hot mix (ARHM)
<br />• Ocean View Estates (OVE) Parking Lot Expansion ($750K) — Providing an additional 14 on -site parking
<br />and landscaping
<br />• Residential Overlay of Maintenance Zone 6 ($1.5" — Rehabilitate 131street segments
<br />As -Needed Construction Management and Inspection Services Contract, City of Manhattan Beach, CA
<br />Project Manager for Inspection Services for variety of transportation, parks, water and sewer projects:
<br />luallace&ASSOCIales City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 34
<br />
|