Laserfiche WebLink
Carl Wallace, PE <br />Project Manager <br />Mr. Wallace has over 28 years of experience in managing public works <br />infrastructure, water and construction programs for several public entities <br />and is highly experienced in managing large scale projects during design <br />and construction phases. He brings strong understanding of local, state <br />and federal funding requirements, Caltrans LAPM, Greenbook Standards. <br />Since starting W&A in January of 2010, Carl provides project and contract <br />management services, as well as oversees all QA activity. He ensures the <br />success of each project and provides support to both clients and <br />personnel. His key responsibilities have included managing capital <br />construction projects ranging from small projects to major programs with <br />construction values up to $500M. Specific responsibilities have included <br />staffing, management, project delivery, on -time performance, adherence to <br />jurisdictional requirements, hiring and managing other consultants for <br />tasks involving testing, project controls, inspection, resident engineering <br />and claims management, and he has personally performed these same <br />duties for a variety of local, state and federal projects. <br />On -Call Construction Management and Inspection Services, City of <br />Fullerton, CA <br />Project Manager providing Construction Management and qualified <br />inspectors for a variety of Capital Improvement projects. Projects include <br />street rehabilitation, traffic signal and intersection, water and sewer <br />improvements, storm drain facilities, landscaping and irrigation. Oversees <br />and monitors inspection staffing and provides Quality Assurance for our <br />staff. Projects include: <br />Experience <br />28 years <br />Education <br />BS, Engineering; San Diego State <br />University <br />Registrations <br />Registered Civil Engineer, CA <br />#C59307 <br />Certifications <br />Caltrans Resident Engineers <br />Academy <br />FTA Grant Management <br />40-hour HAZMAT Training <br />10-hour OSHA Training <br />Affiliations <br />American Society of Civil Engineers <br />American Public Works Association <br />Construction Management <br />Association of America - Past <br />Board Member <br />American Water Works Associates <br />American Construction Inspectors <br />• Valencia Drive Infrastructure Improvements ($1.54 — Work involves traffic control, water shut downs <br />and tie-ins, grinding and repaving, and infrastructure improvements. <br />• Chapman Avenue Rehabilitation ($1.5M) — Street and sidewalk improvements that include potholing, <br />grading, reconstruction and traffic control. <br />• 4300 N. Harbor Boulevard ($2.5M) — On and off -site improvements for a new development. Work <br />includes grading, paving, ADA sidewalk and ramps, curbs, gutters and driveways. <br />On -Call Construction Management and Inspection Services, City of Huntington Beach, CA <br />Contract Manager overseeing the Construction Management, Inspection, Administration and Labor <br />Compliance services on a task order basis for State -Funded, Federally -funded and non-State/Federally- <br />funded capital improvement projects. This initial three-year contract includes various public works <br />infrastructure projects such as traffic signals, pump stations, lift stations, curb, gutter, sidewalks, pipelines, <br />structures, road rehabilitation and bridge retrofits. Specific projects include: <br />• Edgewater Sewer Lift Station Project ($3.5M) — The abandonment and demolition of an existing sewer <br />lift station, and the installation of a new 1000 gpm submersible sewage lift station and force main <br />• Traffic Signal Improvements at the intersections of Main St at 17th St/Utica Ave, and Bolsa Chica St at <br />Pearce Dr ($540K) — Adds a protected left turn phasing and constructing ADA compliant ramps, and <br />the installation of a new traffic signal <br />• Various Signalized Intersections ($ Varies) — Installation of protected left turn phasing, traffic signal <br />poles and interconnect conduit and fiber optic cable <br />• 2019 Pavement Rehabilitation ($2M) — Rehab of pavements on three streets with wearing surface <br />course of fiber -reinforced rubberized asphalt concrete hot mix (ARHM) <br />• Ocean View Estates (OVE) Parking Lot Expansion ($750K) — Providing an additional 14 on -site parking <br />and landscaping <br />• Residential Overlay of Maintenance Zone 6 ($1.5" — Rehabilitate 131street segments <br />As -Needed Construction Management and Inspection Services Contract, City of Manhattan Beach, CA <br />Project Manager for Inspection Services for variety of transportation, parks, water and sewer projects: <br />luallace&ASSOCIales City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 34 <br />