Jin Chong, ICC, AWS
<br />Senior Construction Inspector
<br />Warner Avenue Gravity Sewer, City of Huntington Beach, CA
<br />Resident Inspector for the installation of 2,000' of 24" VCP micro -tunneled sewer line and the construction of
<br />micro -tunneling pits in close proximity to utilities and associated shoring installation, installation of tunneling
<br />jacks, monitored micro -tunneling jacking alignment, prepared daily inspection reports, reviewed shop drawings
<br />and inspected traffic control and SWPPP measures. Duties included coordination with materials testing
<br />subconsultants, providing daily reports, checking quantities for progress payments, tracking extra work and
<br />contract change order work, coordinating with agency operations and maintenance staff for construction
<br />activities and start-up, reviewing as-builts and performed QA inspection for the project.
<br />Sewer Pipeline Rehabilitation Phase 0-1, City of San Diego, CA
<br />Resident Engineer for approximately $4M, six and one-half mile existing sewer main rehabilitation project. This
<br />work was located within the City of San Diego and the project includes point repairs, manhole replacement,
<br />manhole rehabilitation, manhole repair, construction of new cleanouts, and rehabilitation of existing sewer
<br />laterals. Duties included coordination with materials testing subconsultants, prepared daily reports, checked
<br />quantities for progress payments, tracked extra work and contract change order work, coordinated with City
<br />operations and maintenance staff for construction activities and start-up and reviewed as-builts for the project.
<br />Citywide Pump Station Upgrades, Group III Sewer Force Mains, City of San Diego, CA
<br />CM/Resident Engineer/Inspector for $2.9M project for installation of new PVC sewer force main, new
<br />discharge manholes, and the other items as defined by plan and specification at total of 12 Sewer Pump
<br />Stations located in San Diego. Duties included coordination with materials testing subconsultants, prepared
<br />daily reports, checked quantities for progress payments, tracked extra work and contract change order work,
<br />coordinated with City operations and maintenance staff for construction activities and start-up and reviewed as-
<br />builts for the project.
<br />Rio Vista Water Treatment Plant, Castaic Lake Water Agency, Los Angeles, CA
<br />Resident Inspector for the $80M plant expansion and building of new clarifier -filter structure, conversion of raw
<br />water pipeline to an ozone pipeline contactor, installation of the pump station for plant water, sludge thickener
<br />tank, modification of the wash water recovery basins, installation and modification of electrical controls with a
<br />master programmable logic controller to support future capacity. Duties included coordination with materials
<br />testing subconsultants, provided special inspection for structural steel, welding, structural concrete, provided
<br />daily reports, checked quantities for progress payments, tracked extra work and contract change order work,
<br />coordinated with agency operations and maintenance staff for construction activities and start-up, reviewed as-
<br />builts and performed QA inspection for the project.
<br />Earl Schmidt Intake Pump Station Modification, Castaic Lake Water Agency, Los Angeles County, CA
<br />Construction Manager/Inspector for $4.7M removal and reinstallation of existing 54" diameter discharge header
<br />located at pump station lower level, and realignment of the existing 24" diameter, discharge piping, valves and
<br />appurtenances. Duties included coordination with materials testing subconsultants, provided special inspection
<br />for structural steel, welding, structural concrete, provided daily reports, checked quantities for progress
<br />payments, tracked extra work and contract change order work, coordinated with agency operations and
<br />maintenance staff for construction activities and start-up, reviewed as-builts and performed QA inspection for
<br />the project.
<br />Ground Water Transmission Main Project, Phase II, Castaic Lake Water Agency, Los Angeles County,
<br />CA
<br />Construction Manager and Inspector for installation of the new 16" groundwater transmission main. Duties
<br />included coordination with materials testing subconsultants, provided special inspection for structural steel,
<br />welding, structural concrete, provided daily reports, checked quantities for progress payments, tracked extra
<br />work and contract change order work, coordinated with agency operations and maintenance staff for
<br />construction activities and start-up, reviewed as-builts and performed QA inspection for the project.
<br />Sewer Lift Station D, City of Huntington Beach, CA
<br />Resident Engineer responsible for quality control and construction inspection. The project consisted of a new
<br />concrete subterranean sewer lift station with a 55' deep forebay, pumps, piping, electrical and instrumentation
<br />systems and back-up generator. Duties included interfacing with the area's major utilities and Orange County
<br />Flood Control District, coordination with materials testing subconsultants, provided daily reports, checked
<br />Manacemssaslues City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 60