Laserfiche WebLink
TAIT & Associates, Inc. <br />:a On -Call Water Resources Engineering Services <br />_30000000K_ <br />Education <br />B.S. --Civil Engineering, <br />General Emphasis <br />Katherine Grimard <br />DESIGNISURVEy ENGINEER <br />Katie is a graduate of Purdue University, Class of May 2013. Katie works in <br />TAIT's Survey Department developing Basemaps for roadway and pipeline <br />replacement projects. She has been an essential team member by applying her <br />understanding of engineering design and survey on TAIT's public and private <br />projects. Recent projects include Lome Ridge Underground Basemaps for <br />Orange County Sheriff Department and OC Public Works and Chino Quadrant III <br />Water Main Replacements. <br />Purdue University, 2013 Loma Ridge Undergrounds —Design Engineer, 2019 <br />Katie developed Basemaps and underground plans for new Dry Utilities <br />Year of Tait Team Extended from Newport Road in Orange, CA to Loma Ridge Emergency <br />Enlistment Operations Center (approximately 4 miles). <br />2013 <br />Chino Quadrant III Water Main Replacements, City of Chino — Design Engineer, <br />Total Experience 2018-2019 <br />6 Katie developed Basemaps and water line replacement plans for 7000 linear <br />Certifications feet 8" water line replacement on 12 residential streets. <br />Engineer in Training Kenneth and Ben Lomond Water Main Replacement Projects, Glendale Water <br />ET31300303 & Power — Design Engineer, 2015-2016 <br />Katie developed Basemaps and water line replacement plans for approximately <br />11,340 linear feet of new 12-inch and 8-inch diameter ductile -iron water <br />mains. Existing galvanized and copper services smaller than 1 inch were <br />replaced with 1-inch copper services. Existing fire hydrants were replaced and <br />spacing was increased to provide current fire protection to the neighborhood. <br />Pipeline Management Program — City of Glendale Water and Power, Design Engineer, 2015-Present <br />Designed the base maps from record maps and aided in coordination of as -built plans with waterline <br />contractor and city plan checker. <br />FY 13/14 Major Street Rehabilitation — City of Pomona, Design Engineer, 2014-2015 <br />Pavement and partial sidewalk and ramp replacement. Aided in site walk coordination and plan design. <br />Columbia Square — Kilroy Realty Corp, Design Engineer, 2013- Present <br />Katie assisted in the design and calculation of the SUSMP controls for the runoff of water into planters. <br />Fullerton Crossings- M&H Realty Partners V, L.P., Design Engineer, 2013- 2015 <br />Katie aided in the design of Fullerton Crossings in the second phase. Responsibilities and tasks assigned <br />included redesign of storm -water drains to meet client's request, movement of roof run-off drains to <br />resemble architect plans, and erosion control and utility modifications. <br />Promenade at Downey —Alberta Development Partners, Design Engineer, 2013-2015 <br />Katie assisted in the procurement of permits and applications through communication with multiple <br />counties to ensure success of project without impediments. <br />�II TAIT — Appendix Page 136 <br />