Laserfiche WebLink
Roger Vega <br />Construction Inspector <br />EXPERIENCE <br />With Psomas for less <br />than 1 year; with other <br />firms for 14 years <br />Roger Vega is a skilled inspector of many disciplines of Caltrans <br />Highway, Public Works Infrastructure. He has experience in inspecting <br />per project plans, special provisions, specifications, building codes, <br />standard plans, SWPPP, and safety policy. Competent in traffic control <br />placement, all elements of bridge work, soldier piles, CIDH piles, <br />retaining walls, steel reinforcement, welding inspection, PCC placement, <br />tie backs, retaining walls, soundwalls, catch basins, pump stations with <br />electrical and mechanical work. Expert in underground work such as <br />water mains, sewer, storm drain, electrical, traffic signals, and irrigation, <br />utility coordinator for relocation of facilities. <br />Experience <br />Century Boulevard Mobility Improvements, City of Inglewood, CA: <br />Construction Inspector for this 30-inch Jointed Plain Concrete Pavement <br />(JPCP) replacement project. The project will reconfigure and improve <br />approximately three miles of infrastructure on Century Boulevard <br />between La Cienega (west of 1-405) and Van Ness Avenue in the east. <br />Improvements along the corridor include the addition of exclusive <br />dedicated right- and left -turn lanes at major intersections, installation <br />of raised landscaped medians, traffic signals and streetlight upgrades, <br />crosswalk and sidewalk improvements, installation of bus shelters and <br />concrete bus pads, and parkway landscaping. <br />Seaside Way Pedestrian Bridge, City of Long Beach CA: As <br />Lead Inspector, read and interpreted construction plans, codes and <br />specifications. Coordinated and communicated with team to accomplish <br />task safely, Used building level to lay out control for CIDH piles, set <br />and place forms for Columns. Ensure PCC was casted and vibrated <br />in accordance to Caltrans specifications. Ensure PCC was sampled <br />per Caltrans frequency of testing. Set falsework bents, I beams, joists, <br />and forms for box girder bridge. Work with project engineer to interpret <br />plans and lay out unique bridge configuration consisting of a spine <br />beam box girder and 76 ribs. Set forms, work with subcontractors, and <br />ensure that reinforcing steel, electrical conduits, and prestressing ducts, <br />were installed correctly. Calculate PCC to be placed for box girder <br />concrete. Monitor placement of PCC, quality of material, correct vibratory <br />methods to consolidate the material. Coordinate with local inspectors for <br />conformance to project plans, and monthly quantities. <br />Bogert Trail Bridge Rehabilitation Project, Palm Springs, CA: <br />As Lead Carpenter, read and interpreted construction plans, codes <br />and specifications. Used building level to lay out control for piles and <br />footings, set forms for bents. Calculate grades and set precast girders <br />on diaphragms, construct deck and complete bridge. Ensured reinforcing <br />steel had clearances in advance of PCC placement. Ensured PCC was <br />casted and vibrated in accordance to Caltrans specifications. Ensured <br />PCC was sampled per Caltrans frequency of testing. Calculate PCC to <br />be placed in advance. <br />PSOMAS RFP Na. 19.118 1 On -Cali Yiln.r RaSOLO e3 ConsUucoan PAanzgement and Inspection �_rvices I City of Santa Ana <br />