Roger Vega
<br />Construction Inspector
<br />EXPERIENCE
<br />With Psomas for less
<br />than 1 year; with other
<br />firms for 14 years
<br />Roger Vega is a skilled inspector of many disciplines of Caltrans
<br />Highway, Public Works Infrastructure. He has experience in inspecting
<br />per project plans, special provisions, specifications, building codes,
<br />standard plans, SWPPP, and safety policy. Competent in traffic control
<br />placement, all elements of bridge work, soldier piles, CIDH piles,
<br />retaining walls, steel reinforcement, welding inspection, PCC placement,
<br />tie backs, retaining walls, soundwalls, catch basins, pump stations with
<br />electrical and mechanical work. Expert in underground work such as
<br />water mains, sewer, storm drain, electrical, traffic signals, and irrigation,
<br />utility coordinator for relocation of facilities.
<br />Experience
<br />Century Boulevard Mobility Improvements, City of Inglewood, CA:
<br />Construction Inspector for this 30-inch Jointed Plain Concrete Pavement
<br />(JPCP) replacement project. The project will reconfigure and improve
<br />approximately three miles of infrastructure on Century Boulevard
<br />between La Cienega (west of 1-405) and Van Ness Avenue in the east.
<br />Improvements along the corridor include the addition of exclusive
<br />dedicated right- and left -turn lanes at major intersections, installation
<br />of raised landscaped medians, traffic signals and streetlight upgrades,
<br />crosswalk and sidewalk improvements, installation of bus shelters and
<br />concrete bus pads, and parkway landscaping.
<br />Seaside Way Pedestrian Bridge, City of Long Beach CA: As
<br />Lead Inspector, read and interpreted construction plans, codes and
<br />specifications. Coordinated and communicated with team to accomplish
<br />task safely, Used building level to lay out control for CIDH piles, set
<br />and place forms for Columns. Ensure PCC was casted and vibrated
<br />in accordance to Caltrans specifications. Ensure PCC was sampled
<br />per Caltrans frequency of testing. Set falsework bents, I beams, joists,
<br />and forms for box girder bridge. Work with project engineer to interpret
<br />plans and lay out unique bridge configuration consisting of a spine
<br />beam box girder and 76 ribs. Set forms, work with subcontractors, and
<br />ensure that reinforcing steel, electrical conduits, and prestressing ducts,
<br />were installed correctly. Calculate PCC to be placed for box girder
<br />concrete. Monitor placement of PCC, quality of material, correct vibratory
<br />methods to consolidate the material. Coordinate with local inspectors for
<br />conformance to project plans, and monthly quantities.
<br />Bogert Trail Bridge Rehabilitation Project, Palm Springs, CA:
<br />As Lead Carpenter, read and interpreted construction plans, codes
<br />and specifications. Used building level to lay out control for piles and
<br />footings, set forms for bents. Calculate grades and set precast girders
<br />on diaphragms, construct deck and complete bridge. Ensured reinforcing
<br />steel had clearances in advance of PCC placement. Ensured PCC was
<br />casted and vibrated in accordance to Caltrans specifications. Ensured
<br />PCC was sampled per Caltrans frequency of testing. Calculate PCC to
<br />be placed in advance.
<br />PSOMAS RFP Na. 19.118 1 On -Cali Yiln.r RaSOLO e3 ConsUucoan PAanzgement and Inspection �_rvices I City of Santa Ana
<br />
|