Jane E. Freij
<br />Labor Compliance Manager
<br />Project Role: Labor Compliance Monitoring and Enforcement
<br />Ms. Freij is an experienced Administrative/Project Manager with a proven record of profitability achieved
<br />through comprehensive and effective management of time and budget. Key areas of expertise include
<br />project needs analyses, scheduling and budgeting, contract administration/negotiation, legal
<br />documentation, policy and procedure development, and writing and editing. As a Supervising Labor
<br />Compliance Manager, Ms. Freij provides oversight of labor compliance monitoring services for various
<br />federally -funded projects under FHWA, FTA, HUD, and EPA. She is familiar with the FHWA federal
<br />funding administration process from field review and request for authorization to final invoicing and has
<br />specialized training in reporting requirements and fraud detection and prevention procedures.
<br />Relevant Project Experience
<br />Tim Spencer Alley CM/Inspection, City of Davis, CA. Labor Compliance Manager. The project
<br />consisted of improvements within Tim Spencer Alley, including water main demolition, water main and
<br />sanitary sewer main installation, pavement resurfacing, CIPP sewer main lining, temporary water sewer
<br />bypass, water sewer service installations, asphalt and concrete demolition, grading, PCC improvements,
<br />ADA compliant ramps, street furniture, landscaping and street lighting, and other appurtenant work.
<br />Sewer Line, Repair, Replacement and Slip Lining Program - Phase 1, City of Ridgecrest, CA. Labor
<br />Compliance Manager. Willdan was responsible for the evaluation, design, and preparation of
<br />construction documents and construction management for the replacement of 12,022 linear feet of
<br />sanitary sewer pipe. Willdan's design team reviewed available CCTV records to evaluate the conditions
<br />of the existing sanitary sewer line. Willdan then used the findings of the evaluation to determine which
<br />sections of the sanitary sewer and corresponding manholes could be repaired and which sections
<br />needed to be replaced. We then prepared the design and construction documents for Phase 1 of the
<br />City's new multiyear sewer rehabilitation and replacement program. The final construction project
<br />included 6,890 linear feet of sewer rehabilitation, 5,130 linear feet of sanitary sewer replacement, the
<br />reconnection of 172 laterals with Brim style inserts, and full street width pavement rehabilitation over the
<br />5,130-foot sewer replacement road segment.
<br />Landscape Improvement Project, 91 Freeway, City of Bellflower, CA. Labor Compliance Manager.
<br />Willdan provided construction engineering services for the City of Bellflower's federally funded landscape
<br />improvement project within the Caltrans 91 Freeway ROW. The project involved demolition of existing
<br />improvements, installation of new plant material, construction tubular fence, painting of existing
<br />abutment, ADA compliant ramps, rock blanket, irrigation and other appurtenant work.
<br />HSIP Cycle 8, Traffic Signal Improvement Project, City of San Fernando, CA. Labor Compliance
<br />Manager. Willdan provided traffic engineering design services for the HSIP Cycle 8 Traffic Signal
<br />Improvement Project, Federal Aid Project No. H8-07-046, City Project No. 7598. Services required for
<br />the project included environmental documents and technical studies, federal compliance, design
<br />engineering, specifications, and estimate for the improvements, and engineering support during
<br />construction.
<br />Miscellaneous Engineering Services FY 18-19 — FY 20-21, City of Rancho Palos Verdes, CA. Labor
<br />Compliance Manager. Provide on -call miscellaneous engineering services for FY 18-19 through FY 20-
<br />21 regarding federal and state funds and programs, DBE, and prepare the required federal
<br />documentation and labor compliance for federally and state funded projects for submittal to Caltrans.
<br />Sotamant of Qualifications for W ate, Resources
<br />Appendix A — Resumes construction Management and inspection Services
<br />
|