My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEYAZ & PATEL
Clerk
>
Contracts / Agreements
>
B
>
BEYAZ & PATEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 9:30:10 AM
Creation date
5/6/2020 4:26:59 PM
Metadata
Fields
Template:
Contracts
Company Name
BEYAZ & PATEL
Contract #
A-2020-063
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remove samples of sealants, joint compounds, steel pipe coatings, and any other coatings <br />where appropriate, to determine if they contain lead, chromium or zinc in levels exceeding <br />allowable limits addressed in Title 22 of the California Code of Regulations. <br />Evaluate the condition of any observed concrete cracking or spalling, particularly in areas where <br />there may be exposed rebar. Mark and photograph non -hairline cracks (wide enough to stick a <br />dime in) using NSF 61-approved paint. <br />Note areas in each reservoir where corrosion is evident, especially where exposed rebar is <br />present. Determine whether existing sacrificial cathodic protection anodes in those areas are <br />sufficient to deter corrosion. If not, make appropriate recommendations for additional cathodic <br />protection, if warranted. <br />As part of this investigation, the Consultant shall conduct an initial assessment of visually <br />observable corrosion, and if warranted, perform the following tests to better define the extent of <br />the problem and make appropriate mitigation recommendations: <br />1. Electrical continuity tests using exposed reinforcing steel to record reinforcing steel -to - <br />concrete potentials . <br />2. Electrical resistivity tests to determine the voltage difference between existing exposed <br />rebar and other nearby sections of exposed rebar per ASTM C876. <br />3. Penetrating radar half -cell tests. <br />4. pH and chloride testing of spalled concrete or other samples that may be gathered if no <br />spalled concrete samples are present. <br />5. For partially buried reservoirs, consider soil sampling around the tanks to determine <br />potentials at the tank perimeter. <br />Task 4 — Engineenno Services <br />The Consultant shall prepare a seismic, structural and corrosion and security assessment master <br />report of the concrete reservoirs. <br />Seismic & Structural Element: <br />The evaluations shall be site specific and include a full review of the original design plans for each <br />reservoir as well as take into consideration all conditions identified In Task 3. <br />The report shall include analysis of whether or not the reservoirs meet current civil, structural and <br />seismic design standards Including ASCE 7 (Minimum Design Loads for Buildings and Other <br />Structures), ACI 318 (Building Code Requirements for Structural Concrete), ACI 350 (Code <br />City of Santa Ana - RFP 19.107 <br />ENGINEERING SERVICES FOR SEISMIC AND STRUCTURAL ASSESSMENT OF THE CITY'S POTABLE WATER <br />STORAGE RESERVOIRS <br />
The URL can be used to link to this page
Your browser does not support the video tag.