My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEYAZ & PATEL
Clerk
>
Contracts / Agreements
>
B
>
BEYAZ & PATEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 9:30:10 AM
Creation date
5/6/2020 4:26:59 PM
Metadata
Fields
Template:
Contracts
Company Name
BEYAZ & PATEL
Contract #
A-2020-063
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Beyaz & Patel team has a long history of collaboration on potable storage facilities in California and the design of partially buried <br />at -grade circular, and above -grade rectangular, and trapezoidal concrete tanks. We have worked together on the City of Oceanside <br />Reservoir Repairs, Phase 3 project and successfully completed the project on time and within budget. For a list of concrete tank <br />projects, relevant to the seismic and structural assessment of the City's concrete reservoirs, is included in Firm and Team <br />Experience. <br />Project Management Approach <br />Beyaz & Patel has historically used the following integrated cost control and scheduling procedures to successfully complete projects <br />and we believe the system aligns with the goals and objectives of the City's project. Our project manager, Subhash Patel will prepare <br />a detailed schedule and budget for each work task and submit a project progress report to the City each month. This report will <br />delineate any project schedule or budget variances and show the percentage of work completed by task, as well as provide outlook <br />for work tasks expected to be accomplished in the next period. This procedure allows the project manager to properly monitor and <br />manage projects and prevent delay. The project manager, the principal contact with the City of Santa Ana (the City), will coordinate <br />deliverables, site visit(s) and meeting(s) to ensure that the schedule is met. Given that there are no substantial changes in scope, <br />Beyaz & Patel is committed to the on -time delivery of each task order within budget. To ensure the project remain on course, we <br />plan to have regular conference call meetings with the City engineer, Mr. Rosas, to discuss status, progress, and resolve any technical <br />issues. Beyaz & Patel understands the schedule is a three-year duration with the opportunity to expand to five years. We have <br />successfully completed complex projects under similar schedules and do not envision any problems in meeting the stated goals or <br />timelines of this project. <br />Quality Control System <br />Beyaz & Patel maintains an active, effective Quality Assurance/Quality Control (QA/QC) program for all of its projects. Beyaz & <br />Patel's overall quality process is based on a dedication to excellence, performance and service. It is our belief that a project with a <br />quality program dedicated to excellence can only be achieved through open and timely communication with the client, in this case, <br />the City, throughout the life of the project, with communication aimed at meeting the specified requirements established at the kick- <br />off meeting. A formal internal review procedure will be completed at each project milestone and the primary goal is to check the <br />adequacy of design concept and documents, apart from the day-to-day project team's involvement. The review will also offer <br />constructive suggestions for improvement. <br />To achieve the objectives and provide <br />a responsive and comprehensive <br />reservoir assessment and design, the <br />reservoir and site conditions must be <br />understood and key issues must be <br />addressed. Specific issues associated <br />with this project include: inlet piping; <br />roof coatings; security concerns; <br />cracking within tanks; vaults; and <br />inspection and construction <br />sequencing/phasing. First and foremost, <br />we will listen and learn from the City <br />project manager and staff to gain a full <br />understanding of priorities, goals, and <br />expectations. Secondly, we identify and <br />analyze project issues early on in the <br />preliminary design phase and address <br />each issue systematically. <br />e <br />In-... ` <br />i,w.n <br />"p.":=---:gig,. <br />s...m <br />an <br />a <br />�s� <br />zi9 <br />zz <br />, <br />".".,,".... <br />Technical Approach <br />We have put together a technical approach to work outlined in the RFP which demonstrates our understanding of the work to be <br />accomplished. <br />TASK I — PROJECT MANAGEMENT <br />Beyaz & Patel <br />Statement of Qualifications I Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.