My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEYAZ & PATEL
Clerk
>
Contracts / Agreements
>
B
>
BEYAZ & PATEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 9:30:10 AM
Creation date
5/6/2020 4:26:59 PM
Metadata
Fields
Template:
Contracts
Company Name
BEYAZ & PATEL
Contract #
A-2020-063
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gary Ho, PE, SE <br />- ,y <br />Project Manager <br />Education <br />Mr. Ho has over 30 years of experience in structural engineering, design, <br />M.S., Structural <br />and earthquake engineering on water storage, conveyance and <br />Engineering <br />treatment, including reservoirs, tanks, and appurtenances. His extensive <br />University of California <br />experience in structural evaluation, seismic review, and risk analysis, <br />Berkeley, 1976 <br />including probabilistic risk assessments of structures has granted him <br />work with some of the state's largest agencies and private companies. Mr. <br />B.S., Civil Engineering, <br />Ho manages complex design projects involving multiple disciplines. Many <br />University of California, <br />applaud his efforts to simply and streamline such efforts. He lends his <br />Berkeley, 1974 <br />structural expertise to agencies on condition assessment and value <br />engineering studies, and is recognized for his work on concrete reservoirs <br />Registrations <br />and digesters with East Bay Municipal Water District. As technical adviser <br />he will manage the technical review of all deliverables and provide his <br />Structural Engineer, <br />input on management, design, and constructability as well as other <br />California 52534 <br />aspects of the reservoirs project. <br />Civil Engineer, <br />Professional Record <br />California C30496 <br />Forbes Hill Reservoir Cover Replacement Design, Marin Municipal <br />Water District, Corte Madera, California. Managing the design and <br />Affiliations <br />preparation of contract plans and specifications for a new roof structure <br />American Concrete <br />and replacement liner for Forbes Hill Reservoir. The work includes the <br />Institute <br />removal of the existing floating cover and liner, design of a new multi - <br />span aluminum roof structure, design of a new CSPE geomembrane liner <br />American Institute of Steel <br />system, and site/civil design. <br />Construction <br />Reservoir Repairs Phase 3, City of Oceanside, California. Senior <br />structural engineer for condition assessment, seismic evaluations, and <br />Concrete Reinforcing Steel <br />rehabilitation of nine prestressed concrete reservoirs and one steel <br />Institute <br />reservoir ranging in size from 1.5 MG to 5.0 MG. The work included site <br />investigations, seismic assessments per AWWA D110 Standards, and <br />Structural Engineers <br />development of retrofit schemes. The reservoirs are above -ground and <br />Association of Northern <br />partially buried reservoirs. <br />California <br />Reservoir Design Manual, East Bay Municipal Utility District, <br />Oakland, California. Co-author of the personnel reservoir design manual <br />Western Construction <br />for East Bay Municipal Utility District. The manual established the <br />Consultants <br />minimum requirements to be followed in the design of East Bay Municipal <br />Utility District potable water reservoirs. The Design Manual was for use of <br />all engineers working on District reservoir projects, and focused on the <br />major tasks and activities involved in the design conventionally reinforced <br />concrete, prestressed concrete reservoirs, steel and open and cut <br />reservoirs and related structures. <br />Los Angeles/Kern County Recycled Water Project, Phase II - Pump <br />Station, County of Los Angeles Public Works Department, Kern <br />County, California. Principal structural engineer for the structural design <br />of reinforced masonry pump station building. Produced the calculation <br />spreadsheets for the detail analysis and design of the pump station. <br />Performed seismic and wind analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.