Laserfiche WebLink
ADS LLC HOURLY RATE SCHEDU',_' GPSI HOURLY RATE SCHEDULE <br />ROLE <br />HOURLY <br />RATE <br />$218 <br />Senior Region Engineer <br />Senior Project Manager <br />$200 <br />Field Manager <br />$150 <br />Two -Person CSE Crew with <br />Vehicle(Prevailing Wa e <br />$475 <br />Data Analyst <br />$110 <br />Senior Data Analyst <br />$150 <br />Temporary flow monitoring services pricing: <br />• 1 site, 7-day temporary flow monitoring study <br />= $8,750.00 <br />• Add a flow monitor to the study = $3,950.00 <br />per additional monitor <br />Seven-day flow monitoring extension(s): <br />• $1,250 per site, 7-day extension for 1 location <br />• $800 per site, 7-day extension for 2 locations <br />• $650 per site, 7-day extension for 3 locations <br />• $575 per site, 7-day extension for 4 locations <br />• $530 per site for 5+ locations, 7-day extension <br />Additional pricing assumptions apply. <br />CARDNO, INC. RATE SCHEDULE <br />PREVAILING <br />HOURLY <br />ROLE/SERVICE <br />WAGE <br />RATE <br />Pothole under <br />$700/hole <br />$840/hole <br />natural ground <br />Pothole under <br />$840/hole <br />$960/hole <br />avin/concrete <br />Pothole exceeding <br />$130/foot <br />$145/foot <br />6.99 feet in de th <br />Vacuum excavation <br />truck, crew and <br />$415/hour <br />$475/hour <br />equipment <br />Project Engineer <br />$225/hour <br />N/A <br />Senior Project <br />$205/hour <br />N/A <br />Mana er <br />Project Manager <br />$135/hour <br />N/A <br />CADD Technician <br />$105/hour <br />N/A <br />REIMBURSABLE EXPENSES <br />RATE <br />Encroachment and traffic permits <br />Actual cost <br />Subcontractors <br />Cost + 10% <br />Miscellaneous expenses <br />Cost + 10% <br />ROLE <br />HOURLY <br />RATE <br />Principal <br />$170 <br />Certified Photogrammetrist <br />$125 <br />Photogrammetric Production <br />Su ervisor <br />$90 <br />Photogrammetric Technician <br />$75 <br />CAD Editor <br />$75 <br />Digital Imagery Supervision <br />$90 <br />Photogrammetric/Imaging <br />Technician <br />$80 <br />Aerial Project Manager <br />$130 <br />REIMBURSABLE EXPENSES <br />FOR FLYING IMAGE/LIDAR <br />COLLECTION <br />Standard mobilization <br />RATE <br />$700 <br />UltracamFp exposure charge <br />$38 <br />Flight line charge <br />$45 <br />LN-200 IMU charge <br />$510 <br />Project Manager (Flight Planning) <br />$130 <br />RIEGL LMS-Q780 <br />$1,500 <br />NINYO & MOORE HOURLY RATE SCHEDULE <br />HOURLY <br />ROLE <br />RATE <br />Principal Engineer/Geologist/ <br />Environmental Scientist/Certified <br />$195 <br />Industrial Hygienist <br />Senior Engineer/Geologist/ <br />$190 <br />Environmental Scientist <br />Senior Project Engineer/ <br />$185 <br />Geolo ist/Environmental Scientist <br />Project Engineer/Geologist/ <br />$175 <br />Environmental Scientist <br />Senior Staff Engineer/Geologist/ <br />$150 <br />Environmental Scientist <br />Staff Engineer/Geologist/ <br />$145 <br />Environmental Scientist <br />GIS Analyst <br />$125 <br />Technicallllustrator/CAD <br />$103 <br />Operator <br />Data Processor <br />$75 <br />® Stantee City of Santa Ana Fee Proposal fnr Or -Call Wet-r R'SOUT,-es Ergineenirg Services PFI No I 1 C^ 3 <br />