My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA AND AGMT FOR METER INFRASTRUCTURE PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/19/2020
>
20C - AA AND AGMT FOR METER INFRASTRUCTURE PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:21:42 PM
Creation date
5/14/2020 3:51:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
5/19/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 50 <br />6. RESPONSHiILITY OF THE PARTIES <br />6.1 Recipient Responsibilities <br />6.1.1 The Recipient shall carry out the Scope of Work (SOW) in accordance with the terms and <br />conditions stated herein. The Recipient shall adhere to Federal, state, and local laws, regulations, <br />and codes, as applicable, and shall obtain all required approvals and permits. If the SOW <br />contains construction activities, the Recipient is responsible for construction inspection, <br />oversight, and acceptance. If applicable, the Recipient shall also coordinate and obtain approvals <br />from site owners and operators. <br />6.1.2 Interim Performance Reports. The Recipient shall prepare and submit to Reclamation <br />interim Project performance reports (Interim Performance Reports) as required by Section I.10 of <br />this Agreement. Each Interim Performance Report will include (but is not limited to) the <br />information identified in paragraph I.10.3 and will discuss the following: <br />• A comparison of actual accomplishments to the milestones established by the financial <br />assistance agreement for the reporting period <br />• The reasons why established milestones were not met, if applicable <br />• The status of milestones from the previous reporting period that were not met, if <br />applicable <br />• Whether the Project is on schedule and within the original cost estimate <br />• Any additional pertinent information or issues related to the status of the Project <br />6.1.3 Final Project Report. The Recipient shall prepare and submit to Reclamation a final <br />Project performance report (Final Project Report) as required by Section I.10 of this Agreement. <br />The Final Project Report will include (but is not limited to) the information identified in <br />paragraph I.10.3 and will discuss the following: <br />• Whether the Project objectives and goals were met <br />• The amount of water conserved, if applicable, including information and/or calculations <br />supporting that amount <br />• The amount of energy the renewable energy system is generating annually, if applicable <br />• How the Project demonstrated collaboration, if applicable <br />Photographs documenting the project are also appreciated. Recipient understands that <br />Reclamation may print photos with appropriate credit to Recipient. Recipient also understands <br />that the Final Project Report is a public document and may be made available on Reclamation's <br />website, www.usbr.gov/watersmart/. <br />Agreement No. R19AP00131 Agreement Template <br />20 C _g (0312019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.