My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA FOR TRAFFIC SIGNAL MODIFICATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/19/2020
>
20D - AA FOR TRAFFIC SIGNAL MODIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:22:38 PM
Creation date
5/14/2020 4:15:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
5/19/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 3 <br />CONSTRUCTION CONTRACT <br />PROJECT 17-6894 <br />EUCLID STREET AT HAZARD AVENUE SIGNAL MODIFICATION [HSIPL-5063(171)] <br />This CONSTRUCTION CONTRACT is made and entered into this 10 day of May, 2020 by and <br />between the City of Santa Ana, California, a charter city and municipal corporation organized and <br />existing under the Constitution and laws of the State of California (hereinafter "CITY"), and <br />International Line Builders, Inc. (hereinafter "CONTRACTOR"). <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: <br />1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and <br />expense necessary to construct and complete in a good and workmanlike manner and to the <br />satisfaction of the City Engineer of the CITY, the Euclid Street at Hazard Avenue Signal <br />Modification Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in <br />and in accordance with the Contract Documents prepared by the City's Public Works Agency and <br />approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents" as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Technical Provisions and Project Plans <br />• Community Workforce Agreement <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK <br />OF IMPROVEMENT the sum total amount not to exceed Two Hundred Fifty-five Thousand Six <br />Hundred Twenty Dollars and No Cents ($255,620.00), as set forth and identified in the BID <br />PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." <br />The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate <br />quantities only, and the City does not expressly or by implication agree that the actual amount of <br />work will correspond therewith, but reserves the right to increase or decrease the amount of any <br />class or portion of the work or to omit portions of the work as may be deemed necessary or <br />advisable. <br />rev. 09/01/2017 20D-60 Page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.