Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 17-6894: Euclid Street at Hazard Avenue <br />Traffic Signal Modification [HSIPL 5063(171)] <br />Construction Contract <br />$ <br />255,620 <br />Contract Administration <br />$ <br />14,570 <br />Inspection and Testing <br />$ <br />19,030 <br />Contingencies <br />$ <br />25,562 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />314,782 <br />20D-63 <br />