My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH ADOPT RESO FOR WELL 32 IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/19/2020
>
75A - PH ADOPT RESO FOR WELL 32 IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:23:53 PM
Creation date
5/14/2020 4:16:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
5/19/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Well No.32 Rehabilitation Project <br />Final Initial Study/Mitigated Negative Declaration <br />&311=61III Nly197_rIP kiI-Ti1.III JAIQQIaN1e'll!IP lkF-1klk Ion 1:81;9hUIlk U] <br />The following clarifications and modifications are intended to update the draft IS/MND in <br />response to the comments received during the public review period. These modifications clarify, <br />amplify, or make insignificant changes to the IS/MND. Revisions to the IS/MND have not <br />resulted in new significant impacts or mitigation measures or increased the severity of an <br />impact. None of the criteria for recirculation set forth in the CEQA Guidelines section 15088(a) <br />have been met, and recirculation of the IS/MND or preparation of an Environmental Impact <br />Report is not required. <br />The changes to the draft IS/MND are listed by section and page number. Text which has been <br />removed is shown in this chapter with a strikethrough line, while text that has been added is <br />shown with bold and italics. <br />Section 2.3 Other Public Agencies Whose Approval Is Required <br />Page Clarification/Revision <br />2-9 Other public agencies whose approval is expected to be required in the form of <br />permits, financing approval, or participation agreements are as follows: <br />• Santa Ana Regional Water Quality Control Board National Pollutant <br />Discharge Elimination System (NPDES) Permit for well rehabilitation; Storm <br />Water Pollution Prevention Plan for construction activities and development <br />discharge; <br />• Orange County Flood Control District— Discharge Permit; <br />• Orange County Fire Authority — Planning and Development Fire Service <br />Permit; <br />• Orange County Public Works Agency— Encroachment Permit; <br />• City of Santa Ana, Department of Public Works — Encroachment Permit; <br />• City of Santa Ana, Department of Planning and Building — Building, Electrical, <br />Plumbing, Mechanical, Grading, and Police Permits; <br />• City of Santa Ana, Department of Parks and Recreation — Planning and <br />Development Fire Service Permit; and <br />• City of Costa Mesa — Encroachment Permit. <br />December 2019 75A 48 Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.