Laserfiche WebLink
City of Santa Ana Well No.32 Rehabilitation Project <br />Final Initial Study/Mitigated Negative Declaration <br />low nitrate water from Well Nos. 36 and 39 (both located at the reservoir site) with higher nitrate <br />water from Well Nos. 18 and 24 and once reinstated, Well No. 32. By reinstating Well No. 32, <br />the City can more effectively improve its water supply reliability and help ease the burden on the <br />other water production distribution facilities. <br />The disturbed surface area for the rehabilitation of Well No. 32 and construction of the <br />associated pipeline is approximately 0.278 acres. Construction is anticipated to begin in the first <br />quarter of 2020 and continue for approximately 14 months. Once operational, the potential <br />production capacity of rehabilitated Well No. 32 is expected to range from 2,000 to as much as <br />2,500 gallons per minute. <br />1.4 FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />The final IS/MND consists of: <br />• The draft IS/MND, which is incorporated into this final IS/MND by reference <br />• Public comments received during the public review period, see Section 2 and Appendix A <br />• Response to the public comments, see Section 2 <br />• Clarifications and modifications to the draft IS/MND, see Section 3 <br />• Project Impacts and Mitigation Measures, see Section 4 <br />• The Mitigation Monitoring and Reporting Plan, see Appendix B <br />These contents constitute the final IS/MND, to be presented to the City of Santa Ana City <br />Council for certification and approval. <br />a <br />Page 1-2 <br />75A-8 <br />December 2019 <br />