My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - CONTRACT FOR PREVENATIVE ST MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/19/2020
>
23C - CONTRACT FOR PREVENATIVE ST MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:23:06 PM
Creation date
5/14/2020 4:16:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
5/19/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 20-6907 <br />LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20 <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit <br />Price <br />Amount <br />I <br />Unclassified Excavation* <br />740 <br />CY <br />S l u r <br />$ I n 1 O <br />2 <br />Cold Milling (1.5" — 2")* <br />254,300 <br />SF <br />$ / O <br />$ <br />3 <br />Cold Milling (6")* <br />11,800 <br />SF <br />$ I <br />$ Iwo <br />4 <br />Asphalt Concrete (AC <br />Pavement)* <br />3,570 <br />TN <br />$ rl <br />'1 <br />$ 'no �In UG I 0 <br />VI <br />5 <br />Rubberized Emulsion Aggregate <br />Slurry (REAS) Type II* <br />1,600 <br />TN <br />$�n 10 <br />W <br />`U V <br />6 <br />Construct <br />t2ons r ct PCC Curb and Gutter <br />1,080 <br />LF <br />$ <br />$ <br />7 <br />PCC Curb Ramp* <br />6,300 <br />SF <br />$ <br />$ 2 0 o O <br />Jn <br />8 <br />Construct PCC Sidewalk <br />T=4" * <br />3,310 <br />SF <br />$� O <br />$ <br />(0 <br />!JJ <br />9 <br />PCC Cross Gutter* <br />12,800 <br />SF <br />$ 1 1 n <br />$10 (A� n D <br />10 <br />Root Shave* <br />32 <br />EA <br />$ J <br />$ I l U V <br />I I <br />Adjust Manhole Frame & Cover <br />to Finished Grade <br />24 <br />EA <br />$ 0 <br />0 <br />(OVO <br />$ woo <br />�'l `'1 <br />12 <br />Adjust Water Valve Frame & <br />Cover Finished Grade <br />49 <br />EA <br />$� o <br />$ �� <br />4 0 <br />13 <br />Crack Sealing <br />1 <br />LS <br />51000 <br />$ <br />5UV <br />14 <br />Protection of Surface Utility <br />Frames and Covers <br />1 <br />LS <br />$11 Q D <br />$ I f o O <br />l!� <br />21#%'%#P--ff%7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.