My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - WIRELESS LICENSE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/02/2020
>
25F - AGMT - WIRELESS LICENSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 5:17:58 PM
Creation date
5/28/2020 5:12:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
6/2/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7CD73A60-3C9D-4785-9DC5-9A381151512D <br />APPLICATION TO USE MUNICIPAL FACILITY <br />Applicant: Date: <br />Licensee: Application/License#: <br />Type of <br />Municipal <br />Facility <br />Alteration <br />Required <br />small CeB Equipment <br />Heights (provide both (1) <br />theoverall height ofpole <br />structure with added <br />facilities; and (2) the height <br />of individual facilities) <br />small CeB <br />and Base <br />Equipment <br />Weights <br />small Cell <br />And Base <br />Equipment <br />Dimensions <br />Location of Any <br />Additional Equipment <br />[street light] <br />[Pole <br />[Installed on Pole, specify <br />[traffic light] <br />Reinforcement] <br />attachment height, weight <br />[other, <br />[Pole <br />and dimensions] <br />specify] <br />Replacement] <br />[Installed on/in Ground <br />[None] <br />(Vault), speck <br />dimensions] <br />[Other Location] <br />[Not Applicable/Needed] <br />APPLICANT SHALL PROVIDE THE FOLLOWING AS APPLICABLE: <br />Site plan and engineering design and specifications for installation of Equipment, including <br />the location of radios, antenna facilities, transmitters, equipment shelters, cables, conduit, <br />point of demarcation, backhaul solution, electrical distribution panel, electric meter, and <br />electrical conduit and cabling. Where applicable, the design documents should include <br />specifications on design, pole modification, and ADA compliance. Also indicate whether <br />unmetered electricity is available at the site. <br />• Include a load bearing study that determines whether the pole requires reinforcement or <br />replacement in order to accommodate attachment of proposed Equipment. <br />• If the proposed installation will require reinforcement or replacement of an existing pole, <br />provide applicable design and specification drawings. <br />• The number, size, type and proximity to the facilities of all communications conduit(s) and <br />cables to be installed. <br />• Description of the utility services required to support the facilities to be installed. <br />• List of the contractors and subcontractors, and their contact information, authorized to work on <br />the project. <br />• A check for the applicable Application Fee made payable to the City of Santa Ana (refer to <br />Section 5.1 of the Municipal Facilities License Agreement). <br />APPLICANT SIGNATURE: <br />PRINT NAME: <br />TITLE: <br />25PI58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.