Laserfiche WebLink
• Do not duplicate any coded City key furnished by the Public Works Agency for access <br />and operation of the controller. <br />• Surrender all keys furnished by the Public Works Agency at the end of the contract <br />period, or at any time deemed necessary by the City of Santa Ana. <br />• Protect the security of City property by keeping controller cabinets and building doors <br />locked at all times <br />• Refrain from using premises behind locked doors for storage of materials, supplies or <br />tools, except as approved by the City of Santa Ana. <br />• Program normal irrigation between the hours of 10:00 p.m. and 4:00 a.m. or as required. <br />i�:fIc ry►G\ :ZK�P►69 [O <br />The Contractor shall turn off irrigation system during periods of rainfall and times when suspension of <br />irrigation is desirable to conserve water while remaining within the guidelines of horticulturally <br />acceptable maintenance practices as determined by the City of Santa Ana. <br />When the City of Santa Ana acknowledges the necessity to turn on the water once again, all controllers <br />shall be activated within twenty-four (24) hours. After 24 hours, the City of Santa Ana at his discretion <br />may elect to activate the controllers with City forces. <br />1.6.4 IRRIGATION SYSTEM MONITORING & INSPECTION <br />All irrigation systems shall be inspected and adjusted on a weekly basis or more frequently as required, <br />considering the water requirements of each remote control valve. <br />The Contractor shall physically inspect (by manual or semi -automatically running the Controller) the <br />operation of all systems weekly. The Contractor shall maintain all sprinkler systems in such a way as <br />to guarantee proper coverage and full working capability, and make whatever adjustments are <br />necessary, including but not limited to, adjustment of heads or inserts, or replacing of inserts, etc., to <br />prevent excessive over spray/runoff into street right-of-ways or other areas not intended to receive <br />irrigation over spray/runoff. Controllers shall be programmed to water during nighttime hours between <br />approximately 10:00 p.m. and 4:00 a.m. or upon request/when required. <br />Contractor shall observe and note deficiencies occurring from the original design of facilities and review <br />these findings with the City of Santa Ana so necessary improvements can be considered. Authorization <br />must be obtained from the City before proceeding with work not covered under normal maintenance <br />work and the malfunctioning sprinkler system area shall be irrigated by a portable irrigation method <br />until all authorized repairs have been completed to the City's satisfaction. <br />All areas receiving marginal coverage shall be irrigated by a portable irrigation method. The Contractor <br />shall furnish all hoses, nozzles, sprinklers, etc., necessary to accomplish this supplementary irrigation. <br />Care shall be exercised to prevent waste of water, erosion, and/or detrimental seepage into existing <br />underground improvements or structures. <br />City of Santa Ana — RFP 20-041 <br />Landscape Maintenance Services for Public Works Agency City Yard Facility <br />