My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREENTECH LANDSCAPE, INC.
Clerk
>
Contracts / Agreements
>
G
>
GREENTECH LANDSCAPE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 2:33:04 PM
Creation date
6/11/2020 3:15:42 PM
Metadata
Fields
Template:
Contracts
Company Name
GREENTECH LANDSCAPE, INC.
Contract #
N-2020-097
Agency
Public Works
Expiration Date
5/31/2023
Insurance Exp Date
3/27/2023
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall maintain all work sites free of hazards to persons and/or property resulting <br />from his/her operations. Any hazardous condition noted by the Contractor, which is not a result of <br />his/her operations, shall be immediately reported to the City of Santa Ana. The City can cancel or <br />stop work at any time when the safety of the Contractor, the public, etc. is compromised. <br />The contractor shall assure that each employee or subcontractor under the contractor's supervision <br />is trained in the work practices necessary to safely perform his or herjob. The contractor will assure <br />that each employee or subcontractor under the contractor's supervision is instructed in the known <br />potential hazards related to his or her job. The contractor shall assure that each employee or <br />subcontractor under the contractor's supervision follows safety rules and safe work practices. <br />s. SCHEDULES <br />6_1. ANNUAL SCHEDULE <br />❑ The annual schedule shall be submitted for City approval within fifteen (15) calendar <br />days after effective date of the contract. <br />❑ The Contractor shall submit revised schedules when actual performance differs <br />substantially from planned performance. <br />6_2. WEEKLY SCHEDULE <br />❑ Changes to the schedule shall be received by the City of Santa Ana at least twenty- <br />four (24) hours prior to the scheduled time for the work. <br />❑ Failure to notify of a change and/or failure to perform an item of work on a scheduled <br />day may result in deduction of payment for that date, week, or month. <br />❑ The Contractor shall adjust his/her schedule to compensate for all holidays and rainy <br />days. Maintenance and litter removal shall be scheduled for all holidays and rainy <br />days, unless otherwise indicated by the City. <br />6_3. DAILY SCHEDULE <br />❑ Contractor must utilize City of Santa Ana provided cyber key to check in and out of <br />facilities. <br />❑ Changes to daily schedule can be made verbally or by email to the City of Santa Ana. <br />7. PERFORMANCE DURING INCLEMENT WEATHER <br />During periods of storms, Contractor will provide supervisory inspection of the project during regular <br />hours to prevent or minimize possible damage from inclement weather. Contractor shall submit a <br />report identifying any storm damage to the City of Santa Ana attached to a site map identifying <br />location of damage and cost estimate to repair/replace. If remedial work is required beyond the <br />scope of this contract, it shall be considered as extraordinary work. <br />City of Santa Ana — RFP 20-041 <br />Landscape Maintenance Services for Public Works Agency City Yard Facility <br />
The URL can be used to link to this page
Your browser does not support the video tag.