My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA BUSH ST BICYCLE BLVD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
20A - AA BUSH ST BICYCLE BLVD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:01:23 PM
Creation date
6/12/2020 2:55:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM TWO <br />PROPOSAL <br />PROJECT NO.: 18-9002 <br />BUSH STREET BICYCLE BOULEVARD <br />PROJECT NO.: 21-6442 <br />BUSH STREET BIKEWAY WATER IMPROVEMENTS <br />PROJECT NO.: 21-6443 <br />BUSH STREET BIKEWAY SEWER IMPROVEMENTS <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />PALP. !NC DBA <br />FROM: EXCEL PAVING CO%TANY <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />,7F <br />k wl <br />NO.DESCRIl'1'IOly <br />P <br />I <br />l <br />UNCLASSIFIED <br />600 <br />CY <br />$ <br />$ <br />EXCAVATION* <br />2 <br />COLD MILLING* <br />30,700 <br />SF <br />$ <br />$ <br />3 <br />ASPHALT RUBBER HOT <br />370 <br />TN <br />$ <br />$ <br />MIX (ARHM)* <br />4 <br />ASPHALT CONCRETE* <br />470 <br />TN <br />$ <br />$ <br />5 <br />CRUSHED <br />4 <br />.IN <br />$ <br />$ <br />MISCELLANEOUS BASE* <br />6 <br />6" PCC PAVEMENT* <br />7,140 <br />SF <br />$ <br />$ <br />7 <br />4" PCC SIDEWALK* <br />5,750 <br />SF <br />$ <br />$ <br />A-2-6 PCC CURB AND <br />8 <br />GUTTER PER CSA STD. <br />1,410 <br />LF <br />$ <br />$ <br />PLAN NO.1101 * <br />A-2-6 PCC CURB WITH 3' <br />9 <br />GUTTER PER CSA STD. <br />160 <br />LF <br />$ <br />$ <br />PLAN NO. 1101 * <br />20A-17 <br />P-1 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.