Laserfiche WebLink
CITTOF SAATA <br />` /1_`1CU f <br />PROPOSAL <br />PROJECT• : '11 <br />BUSH STREET BICYCLE BOULEVARD <br />PROJECT NO.: 21-6442 <br />BUSH STREET BIKEWAY WATER IMPROVEMENTS <br />PROJECT NO.: 21-6443 <br />BUSH STREET BIKEWAY SEWER IMPROVEMENTS <br />impM t <br />NQ <br />D SCI SP1 { <br />4TY } <br />? Pt <br />kpjtE' <br />.. <br />;., . <br />59 <br />Construct New P.C.C. Sewer <br />3 <br />EA <br />$ <br />$ <br />Manhole <br />Remove Existing Sewer Main <br />60 <br />and Construct 6" VCP Sewer <br />40 <br />LF <br />$ <br />$ <br />Main <br />61 <br />CCTV Inspection of Existing <br />2,540 <br />LF <br />$ <br />$ <br />Sewer Main <br />62 <br />CCTV Inspection of Existing <br />66 <br />EA <br />$ <br />$ <br />Sewer Laterals <br />63 <br />Vertical Offset (As -Needed)* <br />5 <br />EA <br />$ <br />$ <br />64 <br />2" Air Vacuum and Release <br />5 <br />EA <br />$ <br />$ <br />Valve (As -Needed)* <br />Additional Trenching Cost to <br />65 <br />Install Water Pipeline 18" — 30" <br />250 <br />LF <br />$ <br />$ <br />Deeper (Total 54" to 66" cover) <br />As -Needed * <br />66 <br />COLD MILLING* <br />8,500 <br />SF <br />$ <br />$ <br />67 <br />ASPHALT RUBBER HOT <br />105 <br />TN <br />$ <br />$ <br />MIX (A.RHM)* <br />68 <br />As-Builts <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />20A-22 <br />P-6 ofP-22 <br />