My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA BUSH ST BICYCLE BLVD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
20A - AA BUSH ST BICYCLE BLVD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:01:23 PM
Creation date
6/12/2020 2:55:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 6 <br />Bush Street <br />Bicycle Boulevard; Bush St Blkeway Water Improvements; Bush St Sewer Improvements (18-9002; 21-6442; 21- Printed 05/2612020 <br />Bid Results <br />Type <br />Item Code UCM <br />Qty <br />Unit Price <br />Line Total Comment <br />51 <br />Construct 1" Water Service and Connect to Existing Melee <br />EA <br />5 <br />$4,200.00 <br />$21,000.00 <br />52 <br />Construct 2" Water Service and Connect to Existing Meter* <br />EA <br />2 <br />$5,300.00 <br />$10,600.00 <br />53 <br />New Fire Hydrant Assembly, (Including Gate Valve and Lateral Pipe) <br />EA <br />5 <br />$13,000.00 <br />$65,000.00 <br />64 <br />8" Resilient Wedge Gate Valve <br />EA <br />3 <br />$2,000,00 <br />$6,000.00 <br />55 <br />12" Resilient Wedge Gate Valve <br />EA <br />9 <br />$3,000.00 <br />$27,000.00 <br />56 <br />4" Fire Service Connection Including 4"RWGV <br />EA <br />1 <br />$5,000.00 <br />$5,000.OD <br />57 <br />6" Fire Service Connection Including 6" RWGV <br />EA <br />1 <br />$5,000.00 <br />$5,000.00 <br />58 <br />Remove Existing Manhole Structure <br />EA <br />3 <br />$4,000.00 <br />$12,000.00 <br />59 <br />Construct New P.C.C. Sewer Manhole <br />EA <br />3 <br />$12,000.00 <br />$36,000.00 <br />60 <br />Remove Existing Sewer Main and Construct 6" VCP Sewer Main <br />LF <br />40 <br />$1,000.00 <br />$40,000,00 <br />61 <br />CCTV Inspection of Existing Sewer Main <br />LF <br />2540 <br />$3.00 <br />$7,62D.00 <br />62 <br />CCTV Inspection of Existing Sewer Laterals <br />EA <br />66 <br />$400.00 <br />$26,400.00 <br />63 <br />Vertical Offset (As -Needed)* <br />EA <br />5 <br />$5,000.00 <br />$25,000.00 <br />64 <br />2'Air Vacuum and Release Valve (As-Neededp <br />EA <br />5 <br />$7,300.00 <br />$36,500.00 <br />65 <br />Additional Trenching Cost to Install Water Pipeline 18" — 30" Deeper (Total 54" to 66" cover) (As -Needed)* <br />LF <br />250 <br />$30.00 <br />$7,500.00 <br />66 <br />COLD MILLING` <br />SF <br />8500 <br />$2.00 <br />$17,000.00 <br />` i�5 M <br />
The URL can be used to link to this page
Your browser does not support the video tag.