My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A-2 - RESO FOR MISC FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75A-2 - RESO FOR MISC FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 10:02:12 AM
Creation date
6/12/2020 2:55:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A-2
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.67% <br />ADOPTED <br />PROPOSED <br />REVENUE <br />1(19.20 <br />1V2O21 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTION I% <br />PLANNING & BUILDING AGENCY <br />53600 <br />119) Code Modification -simple flat <br />921.25 <br />955.06 <br />53601 <br />53602 <br />53603 <br />53600 <br />120) Code Mobification-motlerate, flat <br />1,842.52 <br />1,910.14 <br />53601 <br />53602 <br />53603 <br />53600 <br />121) Code Motlification-compl- flat <br />3,685.06 <br />3A20.30 <br />53601 <br />53602 <br />53603 <br />53600 <br />122) NOCeeof Violatbn- Structural Plan Cbeak New hourly <br />230.87 <br />239.34 <br />51601 <br />123) Permitissuance Fee-EMP and Misc. Building flat <br />52.20 <br />59.30 <br />51602 <br />51603 <br />51604 <br />51601 <br />124) Permit ssuance Fee - Resitlental and Non Resitlental flat <br />152.55 <br />158.15 <br />51600 <br />125) Permitlszuance Fee-GeneralPan Update surcharge 0 flat <br />22.95 <br />23.79 <br />51601 <br />126) Permit Renewal/E#enzion Fee flat <br />83.22 <br />86.33 <br />51602 <br />)per permit renewetl or attended) <br />51603 <br />51604 <br />51601 <br />127a) Residential Photovottak System)1kW to 151,W) flat <br />450.00 <br />450.00 <br />Plus each addi Tonal kW over 15kW each <br />15.00 <br />15.00 <br />127b) Residential Thermal Systems Ulowth to 10 Mth) flat <br />450.00 <br />450.00 <br />Plus each addi Tonal kWth over 10kW[h each <br />15.00 <br />15.00 <br />127c) Commercial Rooftop Solar jlkW to HIXW) flat <br />1p00.00 <br />1,ow.w <br />Plus such addi Tonal kW over 59kW up to 250 kW each <br />2.00 <br />2.00 <br />Plus each additional kW over 250ON each <br />5.00 <br />5.00 <br />127tl) Commercial Thermal Systems jlkVVh up to 30kMh) fat <br />1,000.00 <br />1,000.00 <br />Plus exM1 addi Tonal kWth between 30kVAh up W 260kMh each <br />2.00 <br />7.00 <br />Plus each addi Tonal kWth over 2600W each <br />5.00 <br />SAO <br />53600 <br />128) Soar Panel- Structural Pan Check hourly <br />230.87 <br />239.34 <br />51601 <br />129) Soar Panel-Inspxtnn Residential flat <br />340.09 <br />352.57 <br />51601 <br />133) Soar Panel- Inspection Commercial fat <br />1024B7 <br />1,062.4E <br />51601 <br />131) Fieltl Pan Chock- zubjectto field Structural Plan Check hourly <br />165.54 <br />172.65 <br />53600 <br />132) CellTower- StructuralPan Chock hourly <br />230.82 <br />239.34 <br />53600 <br />133) Deferretl Suhmittal- StructuralPan Chock hourly <br />230.87 <br />239.34 <br />53600 <br />134) Rooftop equipment StructuralPan Chock hourly <br />230.82 <br />239.34 <br />53600 <br />135) Equipment Changeout StructuralPanChock M1ourly min 1/2 hr <br />230.87 <br />239.34 <br />53600 <br />136) Durt Collecting- Structural Plan Check hourly <br />230.82 <br />239.3c <br />53600 <br />137) Almys/Belaw Ground Tank- Structural Plan Check hourly <br />230.87 <br />239.34 <br />53600 <br />138) Trash Encbzures- Structural Plan Chock fat <br />230.87 <br />239.34 <br />53600 <br />139) Ughting Stantlartls- Structural Plan Check M1ourly min 1/2 hr <br />230.87 <br />239.34 <br />51601 <br />140) Ughting SWntlartlz-Inspection hourly <br />166.53 <br />17264 <br />53600 <br />141) Pedestrian ProtectionStructuralPan CM1ock hourly min 112 hr <br />230.87 <br />239.34 <br />51601 <br />142) Petleztran ProtMion-InspMion M1ourly in 2hr <br />166.53 <br />11261 <br />53600 <br />143) Socurity Cartl Reatler- Structural Pan CM1ock hourly min 1/2 hr <br />230.87 <br />239.34 <br />53600 <br />144) Fire Damage Repair, Structural Plan Chock hourly <br />230.87 <br />239.34 <br />51601 <br />145) Certi irateof Occupancyinspoctan flat <br />59.56 <br />61.75 <br />51601 <br />145) Temporary Certificateof Occupancy fat <br />501.13 <br />519.52 <br />53600 <br />147) VendorStructuralPlan Chock hourly min 1/2 hr <br />230.87 <br />239.31 <br />53601 <br />148) Reāiion-EMPPan Chock hourly min 1/2 hr <br />230.87 <br />239.31 <br />53602 <br />53603 <br />51601 <br />149) Spocal Inspection hourly <br />166.53 <br />ll261 <br />51602 <br />75AA-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.