Laserfiche WebLink
Proposals to Modify Existing Fees FY 2020-21 <br />Parks. Recreation. and Community Services Agency <br />9. Show Mobile-Towina Fee <br />Existing Fee: $230 <br />Proposed Fee: $380 <br />This fee is the cost that the City pays a towing company to move the show mobile to a location <br />and back. ($190 each way) <br />Police Department <br />10. Street Closure Permit/ Accelerated Processina Fee <br />Fee Name <br />Unit <br />Existing <br />Proposed <br />Street Closure Permit <br />Per Permit <br />Fee: <br />$168.68 <br />Fee: <br />$0.00 <br />Street Closure Permit- Small Events (One City block; less <br />Per Permit* <br />$0.00 <br />$272.12 <br />than 100 people) <br />Street Closure Permit- Medium Size Events (1-2 City <br />Per Permit* <br />$0.00 <br />$816.35 <br />blocks, and less than 1,000 people) <br />Street Closure Permit- Large Events (2+ City blocks, <br />Per Permit* <br />$0.00 <br />$2,721.15 <br />intersections, or lanes of traffic, or more than 1,000 <br />people) <br />*In the event, the permit needs to be expedited the actual cost of additional resources will <br />be applied. <br />This fee will be charged to public requesting a Street Closure Permit. Fee is also being <br />modified to include three tiers (event size) and cost has been updated based on the size of <br />the event. <br />Public Works Agency <br />11. Sewer Connection Fee <br />Existing Fee: $111.49 <br />Proposed Fee: $49.00 <br />This fee reduction is based on the most recent Water Rate Study, which used the California <br />Plumbing Code Table 702.1, and the average fixture count for Santa Ana homes. <br />75A&2-90 <br />