Laserfiche WebLink
<br />A. Roadway $ 0 <br />B Property $ 0 <br /> Total $ 0 <br /> <br />9. Assessment of Level of Risk Low X <br /> Moderate <br /> High <br /> <br />For High Risk projects, during design phase, additional Design Study Risk Analysis <br />May be necessary to determine design alternative. <br /> <br />Signature – Dist. Hydraulic Engineer Date _____ <br />(Item numbers 3,4,5,7,9) <br /> <br />Is there any longitudinal encroachment, significant encroachment, or any support of <br />incompatible <br />Floodplain development? NO X YES <br /> <br />If yes, provide evaluation and discussion of practicability of alternatives in accordance <br />with 23 CFR 650.113 <br /> <br />Information developed to comply with the Federal requirement for the Location <br />Hydraulic Study shall be retained in the project files. <br /> <br /> <br />Signature –Project Engineer Date <br />(Item numbers 1,2,6,8) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />* Same as Figure 804.7A Technical Information for Location Hydraulic Study located in <br />Chapter 804 of the Highway Design Manual