My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Natural Environment Study (Minimal Impacts)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Natural Environment Study (Minimal Impacts)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:35:34 AM
Creation date
6/16/2020 8:17:12 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND FIGURE 3 <br />0 Biological Study Area (BSA) O Proposed Roadway Widening <br />Existing Pier Walls (0.09 acres total) Jurisdictional Delineation Limits <br />- Proposed Pier Walls (0.05 acres total) LJ Corps (4.18 acres) <br />z <br />® Potential Detour in River Q CDFW (5.55 acres) <br />0 68.75 137.5 Note: Potential bike detour <br />FEET footprint is approximate. <br />SOURCE: Bing (2016) <br />Fairview Street Improvements <br />from 9th Street to 16th <br />Street and Bridge Replacement Project <br />Aquatic Resources <br />I:\WKE1702\GIS\AquaticResourcesZoom.mxd (8/8/2018) <br />
The URL can be used to link to this page
Your browser does not support the video tag.