Laserfiche WebLink
Chapter 3. Preliminary Noise Abatement Decision <br />Table 3.1: Summary of Abatement Key Information for the Build Alternative <br />Noise <br />Barrier <br />No. <br />Noise <br />Barrier <br />Location <br />Height <br />(ft) <br />Approximate <br />Length (ft) <br />Noise <br />Attenuation <br />Level (dBA) <br />Number of <br />Benefited <br />, <br />Receptors/Units <br />Total <br />Reasonable <br />2 <br />Allowance <br />Estimated <br />Construction <br />Cost (Without <br />ROW Donation' <br />Reasonable <br />? <br />Estimated <br />Construction <br />Cost (With ROW <br />Donation)' <br />Reasonable <br />? <br />8 <br />169 <br />5 <br />1 <br />$95,000 <br />No <br />- <br />No <br />10 <br />169 <br />7 <br />1 <br />$95,000 <br />$225,898 <br />No <br />$207,758 <br />No <br />1 <br />ROW/PL <br />12 <br />169 <br />8 <br />1 <br />$95,000 <br />$242,676 <br />No <br />$224,536 <br />No <br />14 <br />169 <br />9 <br />1 <br />$95,000 <br />$261,270 <br />No <br />$243,130 <br />No <br />16 <br />169 <br />10 <br />1 <br />$95,000 <br />$275,138 <br />No <br />$256,998 <br />No <br />8 <br />129 <br />6 <br />1 <br />$95,000 <br />No <br />- <br />No <br />10 <br />129 <br />8 <br />1 <br />$95,000 <br />$103,251 <br />No <br />$86,701 <br />Yes <br />2 <br />ROW/PL <br />12 <br />129 <br />9 <br />1 <br />$95,000 <br />$116,218 <br />No <br />$99,668 <br />No <br />14 <br />129 <br />10 <br />1 <br />$95,000 <br />$129,533 <br />No <br />$112,983 <br />No <br />16 <br />129 <br />11 <br />1 <br />$95,000 <br />$140,126 <br />No <br />$123,576 <br />No <br />8 <br />113 <br />6 <br />1 <br />$95,000 <br />-- <br />No <br />No <br />10 <br />113 <br />7 <br />1 <br />$95,000 <br />$86,910 <br />Yes <br />$69,880 <br />Yes <br />3 <br />ROW/PL <br />12 <br />113 <br />7 <br />1 <br />$95,000 <br />$98,299 <br />No <br />$81,269 <br />Yes <br />14 <br />113 <br />8 <br />1 <br />$95,000 <br />$110,192 <br />No <br />$93,162 <br />Yes <br />16 <br />113 <br />8 <br />1 <br />$95,000 <br />$119,492 <br />No <br />$102,462 <br />No <br />6 <br />171 <br />7 <br />2 <br />$190,000 <br />$208,301 <br />No <br />$184,391 <br />Yes <br />8 <br />171 <br />10 <br />2 <br />$190,000 <br />$223,396 <br />No <br />$199,486 <br />No <br />10 <br />171 <br />12 <br />2 <br />$190,000 <br />$237,517 <br />No <br />$213,607 <br />No <br />4 <br />ROW/PL <br />12 <br />171 <br />14 <br />2 <br />$190,000 <br />$254,459 <br />No <br />$230,549 <br />No <br />14 <br />171 <br />15 <br />2 <br />$190,000 <br />$273,220 <br />No <br />$249,310 <br />No <br />16 <br />171 <br />16 <br />2 <br />$190,000 <br />$289,097 <br />No <br />$265,187 <br />No <br />6 <br />705 <br />6 <br />2 <br />$190,000 <br />No <br />- <br />No <br />8 <br />705 <br />9 <br />3 <br />$285,000 <br />$461,186 <br />No <br />$412,536 <br />No <br />10 <br />705 <br />11 <br />3 <br />$285,000 <br />$520,938 <br />No <br />$472,288 <br />No <br />5 <br />ROW <br />12 <br />705 <br />13 <br />5 <br />$475,000 <br />$593,082 <br />No <br />$544,432 <br />No <br />14 <br />705 <br />14 <br />7 <br />$665,000 <br />$669,344 <br />No <br />$620,694 <br />Yes <br />16 <br />705 <br />16 <br />7 <br />$665,000 <br />$736,731 <br />No <br />$688,081 <br />No <br />10 <br />184 <br />7 <br />1 <br />$95,000 <br />$130,841 <br />No <br />$119,941 <br />No <br />12 <br />184 <br />8 <br />1 <br />$95,000 <br />$149,114 <br />No <br />$138,214 <br />No <br />6 <br />ROW/PL <br />14 <br />184 <br />9 <br />1 <br />$95,000 <br />$169,047 <br />No <br />$158,147 <br />No <br />16 <br />184 <br />10 <br />1 <br />$95,000 <br />$185,990 <br />No <br />$175,090 <br />No <br />Source: Compiled by LSA Associates, Inc. (2019). <br />Number of receptors/units that are attenuated by 5 dBA or more by the modeled barrier. <br />2 Calculated by multiplying the number of benefited receptors by $95,000 (the dollar amount per benefited receptor/unit). <br />3 Construction cost estimate provided by WKE, Inc. (2018). <br />4 Shaded area represents barrier heights that have been determined to be not reasonable because the barrier would not reduce noise levels by 7 dBA or more. <br />5 Denotes the minimum wall height required to break the line of sight between the receptor and a truck exhaust stack. <br />dBA = A -weighted decibels ft = foot/feet ROW = right-of-way <br />26 Fairview Street Improvements from 9th Street to 16th Street and Bridge Replacement Project Noise Abatement Decision Report <br />