My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Noise Abatement Decision Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Noise Abatement Decision Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:36:35 AM
Creation date
6/16/2020 8:17:56 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4. Secondary Effects of <br />Abatement <br />The secondary effects of noise abatement were considered as part of this NADR. The <br />proposed project includes avoidance, minimization, and/or mitigation measures that <br />lessen potential environmental effects. Noise abatement is a part of the overall project <br />footprint, and most secondary effects would be addressed by these measures. NB <br />Nos. 2 through 5 are feasible and reasonable and do not have any secondary effects <br />that require additional project features or avoidance, minimization, and/or mitigation <br />measures. <br />Fairview Street Improvements from 9th Street to 16th Street 29 <br />and Bridge Replacement Project Noise Abatement Decision Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.