My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Noise Study Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Noise Study Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:39:10 AM
Creation date
6/16/2020 8:18:49 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
List of Tables <br />Table 3.1. <br />Typical Noise Levels.............................................................................................13 <br />Table 4.1. <br />Activity Categories and Noise Abatement Criteria................................................18 <br />Table 5.1. <br />Vehicle Distribution...............................................................................................28 <br />Table 6.1. <br />Short -Term Ambient Noise Monitoring Results....................................................33 <br />Table 6.2. <br />Meteorological Conditions During Noise Monitoring...........................................35 <br />Table 6.3. <br />Long -Term (24-Hour) Noise Level Measurement Results at 1008 North <br />King <br />Street, Santa Ana, California(LT-1)..................................................................36 <br />Table 6.4. <br />Long -Term (24-Hour) Noise Level Measurement Results at 2505 West <br />16th <br />Street, Santa Ana, California (LT-2)..................................................................37 <br />Table 6.5. <br />Model Calibration..................................................................................................38 <br />Table 7.1. <br />Summary of Reasonableness Allowances for Noise Barrier No. 1 .......................42 <br />Table 7.2. <br />Summary of Reasonableness Allowances for Noise Barrier No. 2 .......................47 <br />Table 7.3. <br />Summary of Reasonableness Allowances for Noise Barrier No. 3 .......................48 <br />Table 7.4. <br />Summary of Reasonableness Allowances for Noise Barrier No. 4 .......................48 <br />Table 7.5. <br />Summary of Reasonableness Allowances for Noise Barrier No. 5 .......................49 <br />Table 7.6. <br />Summary of Reasonableness Allowances for Noise Barrier No. 6 .......................50 <br />Table 8.1. <br />RCNM Default Noise Emission Reference Levels and Usage Factors .................52 <br />Fairview Street Improvements from 9th Street to 16th Street ix <br />and Bridge Replacement Project Noise Study Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.