My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Noise Study Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Noise Study Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:39:10 AM
Creation date
6/16/2020 8:18:49 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 2. Project Description <br />A temporary detour within the river bed may be required as a contingency. This <br />would involve construction of dirt and gravel ramps with asphalt topping to and from <br />the SART and the river bed. <br />Construction vehicles would access the Santa Ana River from the gate and ramp at <br />the County of Orange access road at the northwest corner of the bridge, and would <br />use the existing concrete access ramp into the river approximately 250 ft west of the <br />Project Area .All access roads to the SART that are utilized by construction vehicles <br />or for detour routes would be reconstructed and restored to pre -construction <br />conditions or better prior to project completion. <br />10 Fairview Street Improvements from 9th Street to 16th Street <br />and Bridge Replacement Project Noise Study Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.