Chapter 2. Project Description <br />A temporary detour within the river bed may be required as a contingency. This <br />would involve construction of dirt and gravel ramps with asphalt topping to and from <br />the SART and the river bed. <br />Construction vehicles would access the Santa Ana River from the gate and ramp at <br />the County of Orange access road at the northwest corner of the bridge, and would <br />use the existing concrete access ramp into the river approximately 250 ft west of the <br />Project Area .All access roads to the SART that are utilized by construction vehicles <br />or for detour routes would be reconstructed and restored to pre -construction <br />conditions or better prior to project completion. <br />10 Fairview Street Improvements from 9th Street to 16th Street <br />and Bridge Replacement Project Noise Study Report <br />